My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 2:40:08 PM
Creation date
7/21/2022 10:35:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 . What is the minimum waiting period required between the last dispensing of product through the pipeline <br /> and the start of the data collection for a pipeline release detection test? <br /> X no waiting period <br /> _ less than 15 min <br /> _ 15 min to 1 hr <br /> I to 4 hr <br /> _ 4to8hr <br /> _ greater than 8 hr <br /> _ variable (Briefly explain. ) <br /> 15 . What is the minimum amount of time necessary to set up equipment and complete a release detection <br /> test? (Include setup time, waiting time and data collection time. If a multiple-test sequence is used , give <br /> the amount of time necessary to complete the first test as well as the total amount of time necessary to <br /> complete the entire sequence .) <br /> Up to 13 minutes for a passing test on a 589 . 34 gallon line as evaluated (single test) <br /> not applicable hr (multiple test) <br /> 16 . Does the method compensate for those pressure or volume changes of the product in the pipeline that are <br /> due to temperature changes ? <br /> X yes �no <br /> IT Is there a special test to check the pipeline for trapped vapor? <br /> ❑ Yes X no <br /> 18 . Can a test be performed with trapped vapor in the pipeline? <br /> X yes ❑ no <br /> 19 . If trapped vapor is found in the pipeline, is it removed before a test is performed ? <br /> ❑ Yes X no <br /> 20 . Are deviations from this protocol acceptable? <br /> X no ❑ yes_ <br /> If yes , briefly specify : <br /> 21 . Are elements of the test procedures determined by on-site testing personnel ? <br /> ❑ Yes X no <br /> If yes , which ones ? (Check all applicable responses .) <br /> _waiting period between filling the tank and the beginning of data collection for the <br /> test length of test <br /> _determination of the presence of vapor pockets <br /> _determination of " outlier" (or anomalous) data that may be discarded <br /> X other (Describe briefly .) Only during setup . It is necessary to program the console based on the pipeline <br /> characteristics such as bulk modulus or time for the pressure decay from pump pressure down to 10psi . <br /> Data Acquisition <br /> 22 . How are the test data acquired and recorded? <br /> _ manually <br /> _ by strip <br /> Pipeline Release Detection System Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.