My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
3919
>
4600 - Public Water System Program
>
PR0543206
>
COMPLIANCE INFO_1995-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 1:22:59 PM
Creation date
8/25/2022 11:51:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4600 - Public Water System Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2008
RECORD_ID
PR0543206
PE
4630
FACILITY_ID
FA0007111
FACILITY_NAME
FRENCH CAMP GOLF COURSE
STREET_NUMBER
3919
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
20103014
CURRENT_STATUS
01
SITE_LOCATION
3919 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Install the valve in separate bypass piping and connect the <br />plastic tubing as shown in Fig. 7. <br />LOADING THE TANK <br />1. Position the tank so that the fillport is in the front or the <br />rear. NOTICE: For PV -A units with an Aqua -Sensor® <br />sensing device, the fillport must be in the rear. <br />2. Slip a Tetraseal gasket, obtained from the small parts <br />package, up the long outlet manifold until it seats below <br />the manifold collar (Fig. 8). <br />3. Install the outlet manifold into the LEFT (outlet) flange <br />port (Fig. 8). <br />A CAUTION: DO NOT install the outlet manifold <br />into the right flange port. Media will be flushed to <br />service. <br />4. Slip the other Tetraseal gasket up the short, wide -slot <br />inlet manifold until it seats below the manifold collar, <br />then install the inlet manifold in the RIGHT (inlet) flange <br />port. <br />5. Cover the tops of the manifolds with a clean rag. <br />6. Using a large -mouth funnel, load the coarse sand <br />underbedding through the fillport. <br />A CAUTION: DO NOT allow the outlet manifold to <br />move when loading the media. The manifold must <br />remain vertical to ensure a good seal at the gasket. <br />Rap the tank near the bottom with a rubber mallet to level <br />the sand. <br />7. Aqua -Sensor sensing device units only - <br />A. Measure the sensor cable length as shown in Fig. 9 <br />A CAUTION: The sensor has a plastic protective <br />cover which should not be removed until the <br />FILL PORT ` . INLET <br />MANIFOLD <br />OUTLET MANIFOLD <br />GASKET <br />GASKET`+ <br />FIG. 8 <br />10 / HI-FLO® 2 WATER SOFTENER <br />sensor is ready for installation. Avoid touching the <br />carbon rings since oil and dirt can affect the <br />sensitivity of the sensor. The sensor may be <br />cleaned by wiping it with a moistened paper towel <br />which has been sprinkled with household cleaner - <br />rinse thoroughly. <br />B. Moisten the cable sheath and slide the cable grip <br />up or down to the proper cable length. <br />C. Tighten the compression nut so that the fitting <br />cannot slide along the cable. <br />D. Locate the 1.25" NPTE x 0.5" NPTI PVC bushing <br />(packed with the manifolds). Insert the probe and cable <br />through the bushing. <br />E. Wrap the threads of the compression fitting with Teflon <br />tape, then screw the fitting into the bushing. <br />F. Remove the large -mouth funnel. Insert the probe and <br />cable through the fillport. NOTICE: There must be no <br />kinks or bends in the cable. Protect the cable sheath <br />from being cut by the fillport threads, then reinsert the <br />funnel. <br />8. Load the tank with the Cullex® ion exchange resin. <br />Leveling is not required. Remove the funnel. <br />9. Wrap the threads of the PVC reducing bushing with <br />Teflon tape and screw the bushing into the fillport. <br />10. Timeclock units only - <br />Wrap the threads of the 0.5" PVC plug (packed with the <br />manifolds) with Teflon tape and screw the plug into the <br />bushing. <br />FIG. 9 <br />HI-FLO® 2 SENSOR <br />CABLE SETTING <br />PV -45 <br />36in (.91 m) <br />SEE PV -60 <br />35in (.89m) <br />CHART PV -90 <br />47in (1.2m) <br />PV -120 <br />59in (1.5m) <br />PV -135 <br />59in (1.5m) <br />FIG. 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.