My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
3919
>
4600 - Public Water System Program
>
PR0543206
>
COMPLIANCE INFO_1995-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 1:22:59 PM
Creation date
8/25/2022 11:51:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4600 - Public Water System Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2008
RECORD_ID
PR0543206
PE
4630
FACILITY_ID
FA0007111
FACILITY_NAME
FRENCH CAMP GOLF COURSE
STREET_NUMBER
3919
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
20103014
CURRENT_STATUS
01
SITE_LOCATION
3919 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Transfer the O-ring from the beige cductor nozzle to the <br />appropriate nozzle from the small parts pack. <br />6. Lubricate the O -rings with silicone lubricant. <br />7. Install the new nozzle into the eductor throat, then <br />install the assembly into the valve. The locating plate <br />on the throat should face to the rear of the valve. Be <br />certain both the nozzle and the throat are fuTnly seated. <br />8. Reinstall the eductor screen. NOTICE: The screen is <br />intended to protect the eductor nozzle from being plugged <br />by dirt. This protection is less critical for the larger <br />nozzles. If the hard water contains iron but no large <br />particles, the screen should not be used. <br />9. Reinstall the eductor cover with the three screws. <br />A CAUTION: Be sure the eductor cover gasket is <br />properly sealed in its groove, or the valve may leak. <br />NOTICE: If other optional kits are to be installed in the <br />control, it may be more convenient to install the kit(s) in the <br />control at this time. The duplex plugs should not be installed <br />until after the control is mounted on the tank <br />A CAUTION: Each tank port contains a white plas- <br />tic bushing with an O-ring below it. DO NOT remove <br />these bushings, or there will be a leak. <br />Locate the eight 0.5" hex -head bolts in the small parts pack. <br />Place the control on the tank and secure it to the tank in the <br />rear with one bolt to prevent the control from falling <br />forward. <br />A CAUTION: The control must be properly seated <br />on the manifold gaskets, or the connection will leak. <br />Wiggle the control valve until it seats. <br />FIG. 12 <br />12 / HI-FLO® 2 WATER SOFTENER <br />Install the remaining seven bolts and tighten the bolts with <br />an open-end wrench. <br />Verify that the Flo-Pakj.M tubing on PV -B units has been <br />connected as follows (Fig. 13). <br />Solenoid <br />Port No. <br />Valve Connection <br />1 <br />Flo -Pak Tee <br />2 <br />Eductor Cover <br />3 <br />Drain Fitting (Top) <br />Complete the connections by connecting the piping to the <br />rear (PV -A units) or top (PV B units) of the control. <br />SALT STORAGE CONTAINER <br />Place the salt storage container on a smooth, level surface as <br />near to the media tank as possible. Rough surfaces or <br />foreign objects under the tank can result in uneven stresses <br />which can crack or puncture the container. Rotate the <br />container until the brine valve chamber is in the rear. <br />NOTICE: For PV -120A, PV -120B, and PV -135B models, <br />remove the 0.8 gpm flow control from the top of the brine <br />valve and replace it with the 1.4 gpm flow control from the <br />small parts pack. <br />OPTIONAL (LARGE-SIZED) <br />PLASTIC BRINE TANK ASSEMBLY <br />NOTICE: When using Optional Plastic Brine Tanks with <br />PN 00-7736-80 Industrial Brine Valve, order <br />PN 00-3407-40 adapter kit. <br />INSTRUCTIONS: <br />1. Locate the brine tank approximately 6 inches from the <br />softener tank. <br />BRINE <br />SAFE? <br />VALVI <br />IBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.