Laserfiche WebLink
August g` 1979 <br />Project 116-1.3 <br />-2- <br />Table 2 below, provides information on the Barium/Strontium scrubber sludge <br />generated by FMC Corp, (Modesto) and approved for disposal in FMC - Trench #2 <br />near the'northeast corner of the site. <br />Quantity Min. Elevation <br />Date (cu.yds.) Type of Discharge <br />April 12,740 Group 1 15' <br />May 12,000 n o n <br />June 14,O6O <br />Measurable quantities of leachate have not accumulated in the sump at the <br />end of FMC - Trench #1 or #2, <br />Monitoring wells #1, #2 and #3 were checked on July 10, 1979. Each of <br />the wells were found to be dry as a result of declining groundwater levels <br />over the summer months. When groundwater samples become available from <br />the moAitoring walls, barium and strontium will be added to the list of <br />constituents programmed for analysis. This will provide an additional <br />safeguard against migration from the FMC - trench, <br />If you have any questions regarding the contents of this monitoring report, <br />please call' <br />Respectfully submitted, <br />BEfA ASSOCIATES <br />Jack E. HcCo|lough <br />cc: Forward, Inc., Atten: Hr' Greg Basso <br />FMC Corp.'Atten: Mr' Dale 8owlin <br />JEM/sr <br />