Laserfiche WebLink
11 <br /> Paul W. Donoho, R.E.H.S. #6227 <br /> (530) 701-9972 <br /> d oO&M <br /> COMMERCIAL <br /> Start-up & Operation <br /> Introduction Safety Precautions <br /> This section covers the start-up of an AdvanTex®-AXf 00 Treatment Before starting up,maintaining,or servicing any wastewater treatment <br /> System in a commercial application.The formal start-up of an AdvanTex system,observe the following precautions for the safety and heafth of all <br /> Treatment System should only be performed by trained personnel.As a service personnel working with or around wastewater,effluent,and its <br /> trained member of the team performing the system start-up,you play associated equipment: <br /> a critical role in the operation of the system.The decisions made at the •Wear proper clothing that covers all parts of the body that will be <br /> time of the start-up will determine the long-term maintenance needs exposed to wastewater or effluent. <br /> of the system.Regulators,manufacturers,dealers,property owners, • Wear personal protection equipment(PPQ such as rubber gloves <br /> neighbors,and service providers all rely on a thorough start-up. and eye protection when handling or touching any equipment <br /> Before you start your system,please read this entire manual,as well as components that come In contact with wastewater or effluent. <br /> the engineering plans,and contact your Dealer if you have any questions. • Tum off system power at the service entrance panel and set the <br /> You'll save yourself time and money,and you'll reduce the potential for circuit breakers in the panel to their"OFF'positions before removing <br /> any system components.If the control panel or service entrance <br /> follow-up work.For information specific to your system,refer to your panel is not within eyesight of the pumping system,use tock putf <br /> detailed engineering plans. Tag Out tags to ensure safety. <br /> We recommend following the flow path through the treatment train, •Avoid driving over any part of the wastewater treatment system <br /> if possible,when performing the system start-up,beginning at the unless it's been equipped to withstand vehicle traffic.ff the system is <br /> building outlets and ending at the final discharge point.By following this subject to possible traffic,put a barricade up to protect the system, <br /> start-up sequence,the treatment train can be effectively inspected for • Do not enter any tank access.Any work performed on the tank <br /> proper operation and each step in the process can be given systematic should be done from the outside.Gases and/or oxygen depletion in <br /> attention. <br /> the tank can be fatal. <br /> • Secure all tank access lids properly to the riser after all work is <br /> Roles and Responsibilities complete. <br /> Poor to start-up,the Orenw Representative orAdvanTex Dealer will • Practice proper personal hygiene at all times. <br /> contact the Designer,installer,and Service Provider to coordinate a start- <br /> up date.The date will be based on a status report provided by the Orenco <br /> Representative and the availability of all parties.The status report will <br /> include,but will not be limited to,verification of leak testing performed <br /> by the Installer,installation of all equipment,and the avallabriiry of power, <br /> phone line,and water at the site. <br /> • The AdvanTex Dealer is expected to be on site and is either <br /> performing the start-up or acting as a coordinator and general <br /> resource during the installation and start-up of the system. <br /> • The Designer is required at the site during start-up to answer <br /> questions concerning site-specific issues not covered in the plans, <br /> timer settings,and float settings. <br /> • The Installer is required at the site during start-up to address any <br /> installation issues that arise. <br /> • The Service Provider is required at the site during start-up to <br /> become familiar with the system,receive training on control panel <br /> and treatment system operation,and to learn correct sampling <br /> techniques for the system. <br /> Copyright Orenca Systems®,Inc�Properry of Crenco Systems®,inc.np not reproduce or distribute without written auihorizaUon from Crenco:B00-34B-9843. AIM-OM-ATY3,rtev.2.1,OS/T5 <br />