Laserfiche WebLink
12 <br /> Paul W. Donoho, R.E.H.S.#6227 <br /> (530) 701-9972 <br /> AdvanTeXe O&M <br /> Start-upCOMMERCIAL TREATMENT SYSTEMS <br /> & • • - • • - • <br /> Recommended Tools and • Landscaping:Check for landscape features that may cause long- <br /> Equipment-Start—up term maintenance issues: <br /> The fallowing items are recommended for a smooth and successful —Trees planted on top of tanks <br /> start-up: —Trees that could shed snow onto critical components, <br /> such as control panels <br /> • A tool kit containing common tools and these additional items: — Risers,external splice boxes,and pods covered in bark or other <br /> —A cordless power drill with 1/2"nut driver and 3116"hex-head bit landscaping materials <br /> —Voltmeter • Circuit breakers: <br /> — Small electronics screwdrivers Open the control <br /> — Wire strippers/cutters panel and verify <br /> — Cable ties that all of the circuit <br /> —Tape measure breakers are off. <br /> •:� - <br /> • System access: <br /> — Adjustable pliers Remove lid bolts and <br /> •A laptop computer with Hyperterminal(PC)or ZTERM(MAC),to open all lids. <br /> Interface with the control panel if the control panel doesn't have a .AXtOD:Verffy that <br /> touch screen. the lid bolt boxes <br /> • A copy of the layout and a start-up checklist for the person and pressure gauges <br /> performing the system start-up. have been removed <br /> • Appropriate personal protection equipment(PPE}for each person from the AX pods.If <br /> involved in the start-up. not,remove them at this lime.Verify that the lateral inlet valves in <br /> the pods are open and the spray nozzle turbines are pointed up,as <br /> Pre-start-up Inspection shown below. <br /> • Site drainage:Verify that all riser lids,external splice box lids,and <br /> AX pod lids are level and above grade. <br /> I <br /> i� <br /> • Serviceability:Verify that there is a minimum of two feet of space <br /> between AX pods.Check for a useable water source within hose <br /> distance of the system. <br /> • System layout:Verify that the component layout in the plans or <br /> the system diagram matches the installed system and note any <br /> differences between the plans and the installed system. <br /> A{M-OM-RTX-3,Rev.2.1,05!15 •� Gopyrlght Orertco Systems®,Inc Property of Orencro Systems®,Ine.O¢not reproduce or tlls[rlhute without wr[tten authorization from Mn00-348-9843 <br /> B <br />