13 <br /> Paul W. Donoho, R.E.H.S. #6227 <br /> (530) 701-9972 <br /> AdvanTeXe O&M <br /> COMMERCIAL TREATMENT SYSTEMS <br /> Inspection Points <br /> Inspection Points-Control Panels 3.Conduit seal Installation:check for conduit seals on all conduit <br /> connections to the control panel. <br /> Panel •n. WARNING:Failing to seal the conduit may allow corrosive gasses <br /> to corrode major components oienco recommends conduit seals <br /> for all connections to the control panel to assure piopersystem <br /> e operation and component longevity. <br /> 4.Power supply voltage:Make sure the panel breakers are switched <br /> ` off,and check the power supply voltage at the panel. <br /> Not <br /> • On 120 V panels,measure voltage between a and ground.The <br /> voltage should be within ten percent of nominal. <br /> _ • On 230 V panels,measure the voltage between L1 and ground, <br /> and between L2 and ground.The voltage of each leg should be <br /> JJer <br /> r approximately 115 volts.Measure the voltage between L1 and 112. <br /> The voltage should be within ten percent of nominal. <br /> The system may have multiple control panels.Identify if there are control . On 208 V,230 V,and 460 V 3-phase panels,measure the voltage <br /> panels on the section of the system that you are about to start-up. between L1&L2,L2&L3,and L3&Lt.The voltage between <br /> If the tank or basin has associated controls,perform the following start-up each leg should be 208,230 or 460 volts,respectively.ti there <br /> steps: is a voltage difference between line legs,it is an Indication that <br /> the power source may be undersized.The voltage between each <br /> 1.Panel documentation:Locate the panel-wiring diagram inside leg and ground on 208 volts should be approximately 120 volts. <br /> the panel and verify the document matches the document number The voltage between each leg and ground on 460 volts should be <br /> found on the inside of the front panel door.If you can't find the wiring approximately 277 volts.(Due to the variability in the ways 230 V, <br /> diagram,contact Orenco at(800)348-9843 or(541)459-4449 to 3-phase power can be wired,there is not a standard test method.) <br /> have a copy e-mailed or faxed to you. 5.Neutral and ground voltage:Check for any voltage difference <br /> 2.Wiring installation. between each neutral(N)wire in the panel and ground.If there is <br /> Verify all of the main a difference in voltage,use the wiring diagram to track down the <br /> breakers are in the source of the difference and correct it. <br /> "OFF"position.inspect 6.Controls circuit Connect the controls circuit if it is not already <br /> the wire terminatons connected.The controls circuit is now ready to be turned on.Do not <br /> in the panel by giving turn on the pump circuit at this time. <br /> a light tug to all of the WARNING:7uming the pump circuit on at this time can damage the <br /> float wires,pump wires, <br /> pomp power lines,and panel or the pump if the pumps and floats are miswired or if there <br /> isn't sufficient liquid in the tank <br /> main power lines in the . <br /> panel.If a wire comes <br /> loose,reattach the wire <br /> correctly. <br /> WARNING:Failure to idsnfi y a loose wire may muse <br /> intermittent fallures,inconsistent panel operation and over- <br /> curient conditions on the pumps. <br /> Copyright 0[enco Systems®,Ina Property of Orenco Systems®.fnc.Do not reproduce ar distribute without written 31101odza5on from Orenco�800-348-9843.•• A{M-DM-ATx-1,Rev.21,85135 <br />