My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085076_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
4200 – Liquid Waste Program
>
SR0085076_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 4:13:58 PM
Creation date
9/29/2022 9:09:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0085076
PE
4201
FACILITY_NAME
AHERN TRUCK STOP
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25502014
ENTERED_DATE
3/29/2022 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> Paul W. Donoho, R.E.H.S. #6227 <br /> (530) 701-9972 <br /> AdvanTeXo O&M <br /> COMMERCIAL TREATMENT SYSTEMS <br /> Maintenance s • <br /> Annual Maintenance Once a year,send copies of the complete activity log to the appropriate <br /> Measure the scum and sludge accumulation in all tanks annually.Record person.This information is very valuable for analysis and troubleshooting if <br /> scum and sludge measurements on a Field Maintenance Report Form. problems should occur. <br /> 1,Measuring the scum layer.Using a scum utility measuring Check voltages and amperages of all pumps and retard them on a Field <br /> gauge or similar tool,measure the thickness of the scum layer. Maintenance ReportForm.Refer to the start-up voltages and amperages <br /> With this measurement,determine If the distance from the bottom recorded in the"Start-up&Operation"section of this document.If the <br /> of the scum layer at the liquid's lowest normal level to the bottom voltage drop or amperage exceeds NEC requirements,have an electrician <br /> of the outlet tee or to the top of the inlet holes for the pump vault is verify the service line and check pump windings. <br /> 3 inches(76 mm)or less.If so,it's time to pump out the contents The pumping system should be inspected annually to ensure it is <br /> from the tank(scum,sludge,and liquid)completely.After removing operating properly.Unscrew the stainless steel bolts that fasten the <br /> the septage contents from the tank,refill it with water to its normal fiberglass lid over the pumping equipment.Remove the fiberglass lid far <br /> operating level. an inspection that includes these steps: <br /> 2.Measuring the sludge layer.Using a Sludge JudgeQ°or a.Verify there are no obvious holes or leaks in the riser or around the <br /> similar tool,measure the thickness of the sludge layer.With this perimeter of the riser connection to the tank.Wetness or watermarks <br /> measurement,determine if the distance from the top surface of the may be an indication of weeping. <br /> sludge to the bottom of the outlet tee or inlet holes for the pump <br /> vault FVU)is 6 inches b.Inspect the splice box to ensure it is free of water.Ensure the lid and <br /> (152 mm)or less.If so, connections are secure. <br /> again,it's time to pump out c.Verify the floats are in good condition and properly secured to the <br /> the contents from the tank float tree.Verify the float cords are neatly wrapped inside the riser so <br /> (scum,sludge,and liquid) that they cannot interfere with the operation of the floats. <br /> completely,g the tank is d.Vert 'float <br /> fitted with a pump vault - � operation.Refer to the float tests in the"Start-up& <br /> or effluent filter discharge Operation"section of this document. <br /> assembly,take the All ICOM control panels contain a lithium battery for backup.For good <br /> measurement from the top measure,we recommend you replace the battery every two years.Refer <br /> surface of the sludge layer to"Battery Replacement"in the Custom ICOM Control Panels and <br /> to the bottom of the vault's 11yper7erminal Access Manual.provided in Appendix F. <br /> inlet ports.After removing <br /> the septage from the tank, <br /> refill it with water to its <br /> normal operating level. <br /> NOTE:Turn the laterals in the AdvanT60 treatment unit 180 degrees <br /> (so the spray nolle turbines face up)prior to flushing to prevent <br /> naive clogging while matenal is being pushed along the latefal to <br /> the flushing value. <br /> pIM-OM-AT%3,Rev.2.1,05/t5 �•�Copyright erenca Systems®,Inc�Property of Orenco Systems®,Inc Do not reproduce or disNhute without written authorization from Orenaa�89U-348-9943 <br />
The URL can be used to link to this page
Your browser does not support the video tag.