Laserfiche WebLink
25 <br /> Paul W. Donoho, R.E.H.S.#6227 <br /> (530) 701-9972 <br /> A d © O&M <br /> MANUAL <br /> COMMERCIAL <br /> (continued) <br /> Scheduled Maintenance Reference Chart <br /> NOTE:Ali designer specifications and local regulatory requlremenfs <br /> should be followed.This table provides Orenco' minimum recommended <br /> guidelines. <br /> Scheduled Maintenance Reference Chart - . .-. - 611 <br /> a� <br /> ,a <br /> Visual Inspection of Tank Liquid Levels •� • <br /> Check Biotube®Effluent Filters;Clean as Required 01 • <br /> Check Biotube®Pump Vault Filters;Clean as Required •1 • <br /> ILRecond Elapsed Time Meters and Event Counters forAll Pumps • <br /> oper Operation of Automatic oistributingValve(if applicable) • <br /> Sample Influent and Effluent quality Parametee •1 • <br /> Confirm and Record Pump Voltages and Amperages •t <br /> Inspect Distribution of Effluent in AdvanTex Pods;Clean as Required • <br /> Measure Inlet or Residual Pressures taAdvanTex Pods;Clean as Required • <br /> Inspect Recirculating Valve <br /> Record Scum and Sludge Accumulation in Tanks <br /> Flush Distribution Laterals in AdvanTex Pods • <br /> Inspect Pumping System Componerds;Clean as Required • <br /> Replace Lithium Battery in TCDM Control Panel(if applicable) • <br /> This maintenance schedule is only required during the first year of system operation. <br /> 2 Recommended guidelines only.Sampling should be scheduled according to regulatory requirements. <br /> GooYright Orenco Systems",Inc,Property vt Orenco Systems',Irc.no not reproduce or rfistripute without writren authorization from Ore,4o 810-348-9843.•• AIM-GM-ATX-3,Ree.2.1,05!15 <br /> w <br />