Laserfiche WebLink
® DRILLING ® Follow safe work practices,as applicable: <br /> Hazards:Struck-by,run-over,caught . Non-essential personnel to stay clear of drilling work zone when drill rig in operation. <br /> between(pinch points), manual • Equipment inspected daily upon mobilization;maintained in good repair,backup alarms. <br /> lifting,roll over,fluid leaks,fuel • Leaks or defective safety equipment should be repaired before use. <br /> hazards,suspended equipment . Establish eye contact with operator and use hand signals prior to approaching near equipment. <br /> • PPE used near operating rig(eye/head/hearing/hand/foot protection,high visibility vests or equivalent). <br /> • Contractor inspects drill rig daily before use,verify daily that emergency stop is functional. <br /> • Drill rig to be equipped with operational emergency stop,equipment in good repair,machine guards in <br /> j place,whip checks on high pressure lines. <br /> • Park personal/support vehicles in a location as to not obstruct travel lanes or other site operations. <br /> • Operators/helpers maintain safe distance from moving parts;secure loose hair,loose clothing,equipment. <br /> • Drill rigs will only be moved with masts lowered. <br /> • Max.safe slope for rig will be followed,drill rig leveled,appropriate blocking/cribbing as needed. <br /> • Use safety practices for refueling,fuel handling/storage/transport. <br /> i <br /> Spill equipment is available for fuel and hydraulic fluid leaks. <br /> • Verify mechanical lift/rigging equipment(cables,sheaves,boom,attachments)is in proper working order. <br /> i <br /> • Ventilate and conduct air monitoring,as appropriate,when drilling indoors. <br /> Geosyntec Procedure(s):HS-403-Drilling,Others as applicable <br /> ❑ j IMPORTANT! This work may/will ❑ Follow safe work practices per Section B.9.,"Utility Related Hazards" <br /> j include close proximity to overhead <br /> electric utility lines. <br /> B.7. CONSTRUCTION, HEAVY EQUIPMENT,LIFT EQUIPMENT ® Applicable ❑ Not Applicable, Not Anticipated <br /> EXPLANATORY NOTES,CLARIFICATIONS: Drill and development rig movement from location to location. <br /> ® HEAVY EQUIPMENT ® Follow general safe work practices for heavy equipment: <br /> Hazards:Struck-by,run-over,caught . Trained/qualified persons must be authorized by their respective employers to operate all heavy equipment. <br /> between(pinch points),roll over, • Do not get into a potential crush situation below or between equipment,or in an excavation. <br /> fluid leaks,overhead hazards • No passengers allowed on moving/operating equipment. <br /> • Equipment inspected daily upon mobilization;maintained in good repair,backup alarms. <br /> • Leaks or defective safety equipment shall be repaired before use. <br /> • Operator is required to wear seatbelts. <br /> • Maintain eye contact with operator and use hand signals prior to approaching near equipment. <br /> • High visibility vests for all personnel in construction vehicle work area,on-site roadways and travel lanes. <br /> • Maximum safe slope for each vehicle will be followed. <br /> • Personnel to stay clear of,or restrict access to Exclusion Zone or the swing radius and travel path of the <br /> equipment,whichever is larger. <br /> • Spill equipment shall be available for fuel and hydraulic fluid leaks. <br /> • Equipment locked,secured,brakes set,buckets/forks lowered,when operator leaves seat or when equipment <br /> is not in use. <br /> • Park personal/support vehicles in a location away from active work areas. <br /> • Mark temporary roadways clearly,provide berms/stop logs where needed. <br /> Geosyntec Procedure(s):HS-504-Heavy Equipment,HS-132-Competent Persons <br /> ❑ j CRANES 1 ❑ In addition to general safety practices for heavy equipment(above),as applicable: <br /> Hazards: • Only qualified persons operate cranes(certificate required). <br /> — electrocution by overhead utility I . Critical Lift Plan&Checklist prepared/executed(HS 506)prior to mobilization. <br /> — injury in swing radius • Equipment to be inspected prior to mobilization and daily by crane operator. <br /> — injury from falling load . Crane operator will remain at the controls at all times during operation. <br /> — crane tipping over due tod • Crane operation must be performed under the direction of an <br /> overbalancing,high winds, P P appointed signal person at all times. <br /> unstable ground,unsafe slope, • Communication between crane operator and signal person will be maintained through standard hand <br /> bad placement of outriggers signals or voice communication equipment. <br /> — injury from mechanical hazards • Keep area beneath suspended loads clear of personnel. <br /> • Rigging procedures—see Mechanical Lifting,Rigging,below. <br /> Geosyntec Procedure(s):HS-506-Cranes,HS-132-Competent Persons <br /> ❑ MECHANICAL LIFTING,RIGGING ❑ In addition to general safety practices for heavy equipment and cranes(above),as applicable: <br /> Applies to lifting by crane,truck- • Coordinate lifting operations with competent person. <br /> mounted boom rig(e.g.drill rig), I • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> mechanical/electrical hoist,similar • Slings,chains,rope,wire rope and related equipment used for lifting shall be maintained in good condition, <br /> equipment. <br /> Hazards:falling and used in a manner as to protect from damage. <br /> � personnel g loads,P j • Slings,chains,rope,wire rope and related equipment used for lifting shall be securely attached to the forks to <br /> under suspended loads. <br /> prevent inadvertent loss of load.Rigging,gging,wire rope and hoisting equipment will be inspected and maintained <br /> on a weekly basis. <br /> i • Hooks will be equipped with safety latches. <br /> Geosyntec° THA—Drilling/Development Operations Safety 1/29/2019 <br /> GSH Stockton Phyto,TR0712C Page 8 <br /> consultants <br />