My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. BOB FUJII <br /> May 2, 1983 <br /> Page Two <br /> The work proposed for completion in the step below is <br /> referenced by. number to the order received in your letter <br /> dated 12 April, 1983. <br /> 1. We have scheduled delivery of the necessary <br /> supplies and a .drill rig to commence install <br /> ation of monitoring wells #10 through #14 on <br /> Monday, May 2, 1983. We anticipate the monitoring <br /> well construction program will require between <br /> 7' and 8 working days for completion. The <br /> monitoring wells will be constructed of 3 inch <br /> PVC pipe with factory slotted perforations in <br /> the saturated interval at approximately 100 feet <br /> below ground surface. We attempted to schedule <br /> construction of 4 inch monitoring wells as suggested <br /> in your recent memorandum (from Fujii to Pinkos <br /> dated. 14 April, 1983) , however, we have been <br /> unable to schedule or locate' a. drilling rig which <br /> can drill large enough diameter holes using <br /> continuous flight augers to permit installation <br /> of 4 inch casing. We have discussed the alter <br /> native of using 3 inch PVC casing with Mr. Harold <br /> Eagle of the State Water Resources Control Board <br /> and Mr. Robert Fujii of your staff and each has <br /> indicated that 3 inch casing will be acceptable. <br /> 2. A meeting was held with our excavation contractor <br /> on April 25, 1983 at which time we received cost <br /> estimates and schedules for completion of Group I <br /> Disposal Trench #4. The contractor has agreed <br /> to move equipment onto the site during the week <br /> of May 2, 1983 if weather conditions permit. <br /> Immediately following our meeting however, <br /> additional rain was forecast for the week of <br /> April 25 and we cannot guarantee the work will <br /> commence as scheduled. The contractor estimates <br /> that approximately 8 to 9 working days will .be <br /> required to complete Disposal Trench #4. We <br /> anticipate completion of Trench #4 within 30 <br /> days. <br /> 3. Area evaporation ponds #1 through #5 have received <br /> sufficient evaporation to reestablish between 1. 5 <br /> and 2 feet freeboard in all ponds. At present we <br /> do not anticipate reconstruction or operation of <br /> these ponds. It is our intention to eliminate <br /> Solar Evaporation Ponds #1 through #5 and excavate <br />
The URL can be used to link to this page
Your browser does not support the video tag.