Laserfiche WebLink
September 13, 1983 <br /> Project 116-1.4 <br /> - 2 - <br /> Specific Actions <br /> 1. Install monitoring wells 10 through 16 - this activity has been <br /> completed and a compliance report submitted to your office. <br /> 2. Construct Disposal Trench #4 - compliance date September 26, 1983. <br /> State inspection, week of September 26, 1983. <br /> 3. Eliminate and excavate solar evaporation Ponds #1 through #5. <br /> Completion date, week of October 10, 1983. <br /> 4. Regrade and complete cover for Group I Disposal Trenches#1, #2 <br /> and #3. Completion date, week of September 26, 1983. <br /> 5. Relocate access roads. Completion date, week of September 26, <br /> 1983. <br /> 6. Relocate and properly dispose of drilling mud wastes and waste <br /> received from FMC, Modesto. Completion date, week of <br /> October 17, 1983 (assumes the State inspection and approval of <br /> Trench #4 can be obtained during the week of September 26, 1983). <br /> 7. Control surface drainage - week of October 24, 1983. <br /> 8. Regrade cover of Group II Disposal area - week of October 17, 1983. <br /> We wish to thank you for your cooperation in this matter and request that <br /> you submit, as soon as possible, the salt concentrations limits <br /> pertaining to contaminated soils requested above. <br /> Sincerely, <br /> BETA ASSOCIATES <br /> Jack E. McCollough <br /> Certified Engineering Geologist #905 <br /> JEM:sh <br /> cc: Gregory Basso, Forward, Inc. <br /> John Stovall, Neumiller and Beardslee <br /> Dave Tunison, FMC Corporation, Modesto <br /> Lee Hall, San Joaquin Local Health District <br /> Gary Reents, California Department of Health Services <br /> Bud Eagle, State Water Resources Control Board <br /> GBetac_ lssociates Q <br />