Laserfiche WebLink
Potentially Less Than Less Than Analyzed <br /> Significant Significant with Significant No In The <br /> 9 Mitigation 9 <br /> Impact Incorporated Impact Impact Prior EIR <br /> XI. LAND USE AND PLANNING. <br /> Would the project: <br /> a) Physically divide an established community? ❑ ❑ ❑ ® ❑ <br /> b) Cause a significant environmental impact due to a conflict <br /> with any land use plan,policy,or regulation adopted for the ❑ ❑ ® ❑ ❑ <br /> purpose of avoiding or mitigating an environmental effect? <br /> Impact Discussion: <br /> a,b) This project has two components.The first is a General Plan designation change from I/T(Truck Terminal)to A/G <br /> (General Agriculture).The second is a Conditional Use Permit Application for an agricultural processing facility(Use <br /> Type: Industry-Agricultural) to include the construction of a 96,959 square foot two-story building. The project <br /> proposes two 8-hour shifts, with one shift being seasonal.The applicant states the first shift will employ 3 people, <br /> year-round.The applicant states the second shift will be a seasonal shift during harvest and employ 75 people.The <br /> applicant states that approximately 75%or the proposed building will be utilized for the fruit processing,while 25% <br /> will be rented to a third party for storage of produce containers.There is an existing agricultural processing facility <br /> on an adjacent parcel to the west that will likely rent this space,however,that use is separate to this new proposed <br /> use. The project site is surrounded by industrial and agricultural with scattered residences. The project will not <br /> physically divide an established community and is consistent with surrounding land uses. <br /> The current General Plan designation is IFF,and the Industry-Agricultural use type is not consistent with the parcel's <br /> current General Plan designation. If the General Plan designation is changed to A/G as proposed, then the <br /> development project will be consistent with the County's General Plan.The proposed project is an agricultural use <br /> and will have a less than significant impact to surrounding parcels. The project will not create premature <br /> development pressure on surrounding agricultural lands to convert land from agricultural uses to non-agricultural <br /> uses because it is surrounded by various types of urban development including industrial and residential.Therefore, <br /> this project is not growth-inducing. <br /> The proposed project will not conflict with any existing or planned uses or set a significant land use precedent.The <br /> proposed project is not in conflict with any Master Plans, Specific Plans, or Special Purpose Plans, or any other <br /> applicable plan adopted by the County. As a result,the project's impacts to land use and planning considerations <br /> are anticipated to be less than significant. <br /> 17 <br /> Planning Commission Staff Report, PA-2100295 (GP, SA) 20 <br /> Environmental Review <br />