Laserfiche WebLink
The following is an itemized list of hazardous waste violations that have not been <br /> addressed for GOLD RIVER ORCHARDS, INC as of June 26, 2023. <br /> Open violations from September 27, 2021 inspection <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#302-Failed to have all communication or alarm systems,spill control,or decontamination <br /> equipment. <br /> OBSERVATION: The facility is not equipped with the following equipment: <br /> -spill control equipment in the pump station are missing <br /> REGULATION GUIDANCE: <br /> All facilities shall be equipped with the following, unless it can be demonstrated to the Department that none of the <br /> hazards posed by waste handled at the facility could require a particular kind of equipment specified below: <br /> (a)an internal communications or alarm system capable of providing immediate emergency instruction (voice or <br /> signal)to facility personnel; <br /> (b)a device, such as a telephone(immediately available at the scene of operations)or a hand-held two-way radio, <br /> capable of summoning emergency assistance from local police departments,fire departments, or State or local <br /> emergency response teams; <br /> (c)portable fire extinguishers,fire control equipment(including special extinguishing equipment, such as that using <br /> foam, inert gas, or dry chemicals), spill control equipment, and decontamination equipment; and <br /> (d)water at adequate volume and pressure to supply water hose streams, or foam producing equipment, or <br /> automatic sprinklers, or water spray systems . <br /> CORRECTIVE ACTION: Immediately install the following equipment: spill equipment. Provide a corrective action <br /> statement and supporting documentation to the San Joaquin County Environmental Health Department within 30 <br /> days. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 3 of 8 <br />