Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 9-TLM-4 10-TLM-5 11-Ds1-1-FS 12-Dsi-2-FS <br /> Sump Manufacturer Western FG Western FG Western FG Western FG <br /> Sump Depth (inches) 73 1/2" 74" 75 1/2" 75 1/2" <br /> Sump Bottom to Top of 14" No Piping 35" 32" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1:42 1:47 10:52 10:57 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 2:12 2:17 11:22 11:27 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Lss/FailCriteria > .002 > .002 > .002 > .002 <br /> htness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 13-87-1-FS 14-87-2-FS 15-91-FS UDC 1&2 <br /> Sump Manufacturer Western FG Western FG Western FG Bravo <br /> Sump Depth (inches) 75" 74" 74" 30" <br /> Sump Bottom to Top of No Piping 19" 19 1/2" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:02 11:07 11:12 10:16 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:32 11:37 11:42 10:46 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 9 <br />