My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 3:15:53 PM
Creation date
3/22/2023 8:27:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard 0 Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 19&20 UDC 28&29 UDC 30&31 UDC 32&33 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 30" 30" 30" 30" <br /> Sump Bottom to Top of 10" 10" 10" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:11 11:35 11:37 12:02 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:41 12:05 12:07 12:32 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 34&35 UDC 21-M UDC21-S/22-M UDC22-S/23-M <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 30" 30" 30" 30" <br /> Sump Bottom to Top of 10" 12" 12" 12" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:04 11:07 11:12 10:16 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 12:34 11:37 11:42 10:46 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ❑x Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.