Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard 0 Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 19&20 UDC 28&29 UDC 30&31 UDC 32&33 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 30" 30" 30" 30" <br /> Sump Bottom to Top of 10" 10" 10" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:11 11:35 11:37 12:02 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:41 12:05 12:07 12:32 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 34&35 UDC 21-M UDC21-S/22-M UDC22-S/23-M <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 30" 30" 30" 30" <br /> Sump Bottom to Top of 10" 12" 12" 12" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:04 11:07 11:12 10:16 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 12:34 11:37 11:42 10:46 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ❑x Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 7 of 9 <br />