Complaint Investigation Summary <br /> Report #: 5105 <br />COMPLAINT ID: COGENUJ36 Site Location: IN FRONT OF 1049 S WILSON WAY <br />Activity Summary <br />Activity Date Recorded by <br />01/19/2022 Sent an email to Zantha Ricks (PG&E) requesting an update and asked if there MURO <br />will be confirmation sampling for the storm drain area during the replacement. <br />Asked if they have scheduled a date scheduled for the sidewalk and driveway <br />construction. <br />01/26/2022 Organizing files (emails, narrative docs, reports) into a single folder. MURO <br />01/27/2022 Sent an email to Allexis Illich (US EPA) <br />Illich.Alexis@epa.gov since she is the person who was working with PG&E on the <br />PCB spill. I let her know the site is still secured, but has not had any further <br />development and asked if she had any information on the cleanup project. <br />I expressed concerns on the information received by Alex Steele stated they will <br />not conduct anymore sampling during the replacement of the sidewalk and <br />driveway, and probably not sampling the soil at the time the storm drain is <br />replaced. I contacted Zantha Ricks, but she has not responded. <br />MURO <br />01/31/2022 Received reply from Zantha Ricks. She stated she asked Alex Steele to provide MURO <br />update. <br />02/02/2022 Completed three photo logs for complaint. MURO <br />02/10/2022 On my way to an unrelated inspection, observed right southbound lane on Wilson MURO <br />Way was closed due to construction on PCB spill site. Notified and discussed with <br />Elena Manzo. According to Alex Steele, the last time he updated status for <br />cleanup project was that the sidewalk and drive way will be replaced. No sampling <br />to occur during this procedure due to analytical lab result finding the two areas to <br />be non-detect. I will call Alex to follow up on the project. <br />02/23/2022 Called Alex Steele inquiring about the cleanup project. He said for now they (Arrow MURO <br />Construction) are only working replacing the side walk and driveway. He <br />anticipates concrete will be done on Friday, 2-25-2022. Then, PG&E will address <br />the storm drain. No sampling is taking place during the sidewalk and driveway <br />construction. He said he will let me know when they start to work on the storm <br />drain. I let him know I will be handing this complaint over to Lead Senior Elena <br />Manzo, so he will need to contact her. <br />02/24/2022 Sent an email to Zantha Ricks (PG&E) with a cc to Lead Senior Elena Manzo and MURO <br />Alex Steele (PG&E) letting her know that I am no longer overseeing the <br />cleanup/remediation for this complaint. Requested Phase 2 sample results. <br />02/24/2022 Entered incomplete narrative from the field notes I gathered. Organized complaint MURO <br />documents before submitting to Lead Senor Elena Manzo. <br />02/25/2022 After thorough review of the narrative yesterday, I left out some items still needed. MURO <br />Emailed Zantha Ricks (PG&E) requesting the following: <br />Disposal records and final manifests for cleanup on dates 7-27-2021, <br />8-28-2021, 9-4-2021, all future disposal records generated from the remediation <br />project, and any additional cleanup not listed here. <br />Phase 2 and Phase 3 confirmation sample results, and the storm drain wipe <br />sample results from Phase 1, all future lab analysis reports, and any additional <br />sampling not listed here. <br />The plan for remaining cleanup/remediation including the sidewalk, gutter, and <br />driveway work presently taking place; replacement of the storm drain; and any <br />additional work. <br />5105. rpt Page 10 of 12