Laserfiche WebLink
Executive Summary <br /> Level of <br /> Potential Impacts Significance Mitigation Measures <br /> GREENHOUSE GAS EMISSIONS <br /> IMPACT 4.8-1: Would the project generate greenhouse gas Less than No mitigation required. <br /> emissions, either directly or indirectly, that may have a significant Significant Impact <br /> impact on the environment? <br /> IMPACT 4.8-2: Would the project conflict with an applicable plan, No Impact No mitigation required. <br /> policy or regulation adopted for the purpose of reducing the emissions <br /> of greenhouse gases? <br /> HAZARDS AND HAZARDOUS MATERIAL <br /> IMPACT 4.9-1:Would the project create a significant hazard to the Less than No mitigation required. <br /> public or the environment through the routine transport, use, or Significant Impact <br /> disposal of hazardous materials? <br /> IMPACT 4.9-2:Would the project create a significant hazard to the Less than No mitigation required. <br /> public or the environment through the reasonably foreseeable upset Significant Impact <br /> and accident conditions involving the release of hazardous materials <br /> into the environment? <br /> IMPACT 4.9-3:Would the project emit hazardous emissions or handle No Impact No mitigation required. <br /> hazardous materials or acutely hazardous materials, substances, or <br /> waste within 0.25 mile of an existing or proposed school? <br /> IMPACT 4.9-4:Would the project be located on a site which is No Impact No mitigation required. <br /> included on a list of hazardous materials sites compiled pursuant to <br /> Government Code Section 65962.5 and, as a result,would it create a <br /> significant hazard to the public or the environment? <br /> IMAPCT 4.9-5: For a project located within an airport land use plan or, No Impact No mitigation required. <br /> where such a plan has not been adopted,within two miles of a public <br /> airport or public use airport,would the project result in a safety hazard <br /> or excessive noise for people residing or working in the project area? <br /> IMAPCT 4.9-6:Would the project impair implementation of or No Impact No mitigation required. <br /> physically interfere with an adopted emergency response plan? <br /> IMPACT 4.9-7:Would the project expose people or structures, either Less than No mitigation required. <br /> directly or indirectly, to a significant risk of loss, injury or death Significant Impact <br /> involving wildland fires? <br /> Griffith Energy Storage Project ES-26 Tetra Tech/SCH2O22120675 <br /> Draft Environmental Impact Report August 2023 <br />