Laserfiche WebLink
Executive Summary <br /> Level of <br /> Potential Impacts Significance Mitigation Measures <br /> HYDROLOGY AND WATER QUALITY <br /> IMPACT 4.10-1: Would the project violate any water quality Less than Implementation of Mitigation Measure GEO-1 would be required. <br /> standards or waste discharge requirements or otherwise substantially Significant Impact HYDRO-1: Hydrology and Hydraulics Study.The Applicant shall engage a <br /> degrade surface or groundwater quality? with Mitigation qualified practitioner or firm to prepare a comprehensive watershed hydrology <br /> Incorporated evaluation as well as a targeted analysis of hydraulic conditions within specific <br /> portions of the drainage conveyances in the Project site drainage area. This <br /> evaluation and analysis will address both existing conditions and proposed (i.e., <br /> after development)conditions. The results shall provide data of sufficient detail <br /> and quality to allow preparation of a Project Site Drainage Plan that will be <br /> implemented during construction of the Project and provide extended controls for <br /> facility operations. The Site Drainage Plan will include detention ponds to provide <br /> adequate control of stormwater runoff and channel armoring to prevent erosion at <br /> detention pond outlets and new drainage channels. <br /> IMPACT 4.10-2:Would the project substantially decrease Less than No mitigation required. <br /> groundwater supplies or interfere substantially with groundwater Significant Impact <br /> recharge such that the project may impede sustainable groundwater <br /> management of the basin? <br /> IMPACT 4.10-3: Would the project substantially alter the existing Less than Implementation of Mitigation Measures GEO-1 and HYDRO-1 would be required. <br /> drainage pattern of the site or area, including through the alteration of Significant Impact <br /> the course of a stream or river or through the addition of impervious with Mitigation <br /> surfaces, in a manner which would: Incorporated <br /> i) Result in substantial erosion or siltation on-or off-site? <br /> ii) Substantially increase the rate or amount of surface runoff in <br /> a manner which would result in flooding on-or off-site? <br /> iii) Create or contribute runoff water which would exceed the <br /> capacity of existing or planned stormwater drainage systems <br /> or provide substantial additional sources of polluted runoff? <br /> iv) Impede or redirect flood flows? <br /> IMPACT 4.10-4: Is the project in flood hazard,tsunami, or seiche No Impact No mitigation required. <br /> zones, risk release of pollutants due to the project inundation? <br /> IMPACT 4.10-5:Would the project conflict with or obstruct Less than Implementation of Mitigation Measure GEO-1 would be required. <br /> implementation of water quality control plan or sustainable Significant Impact <br /> groundwater management plan? with mitigation <br /> incorporated <br /> Griffith Energy Storage Project ES-27 Tetra Tech/SCH2022120675 <br /> Draft Environmental Impact Report August 2023 <br />