Executive Summary <br /> Level of <br /> Potential Impacts Significance Mitigation Measures <br /> LAND USE AND PLANNING <br /> IMPACT 4.11-1: Would the project physically divide an established No Impact No mitigation required. <br /> community? <br /> IMPACT 4.11-2: Would the project cause significant environmental Less than No mitigation required. <br /> impact due to a conflict with any land use plan, policy, or regulation Significant Impact <br /> adopted for the purpose of avoiding or mitigating an environmental <br /> effect? <br /> MINERAL RESOURCES <br /> IMPACT 4.12-1:Would the project result in the loss of availability of a No Impact No mitigation required. <br /> known mineral resource that would be of value to the region and the <br /> residents of the state? <br /> IMAPCT 4.12-2: Would the project result in the loss of availability of a No Impact No mitigation required. <br /> locally-important mineral resource recovery site delineated on a local <br /> general plan, specific plan, or other land use plan? <br /> NOISE <br /> IMPACT 4.13-1:Would the project result in generation of a substantial Less than NOISE-1: The Project will include sound walls along the perimeter of the Project <br /> temporary or permanent increase in ambient noise levels in the vicinity Significant Impact and between select BESS units. The sound walls will be of various heights and at <br /> of the project in excess of standards established in the local general with Mitigation least 3 pounds per square foot with minimal cracks or gaps. This mitigation <br /> plan or noise ordinance, or applicable standards of other agencies? Incorporated measure is a result of the current operational equipment selected for the Project. <br /> When updated equipment is selected, another assessment will be conducted to <br /> evaluate the need for this mitigation measure. <br /> NOISE-2: The Project shall construct two 26-foot soundwalls on the western and <br /> eastern portions of the Project site to shield the surrounding residential <br /> properties. <br /> IMPACT 4.13-2: Would the project result in generation of excessive Less than No mitigation required. <br /> groundborne vibration or groundborne noise levels? Significant Impact <br /> IMPACT 4.13-3: For a project within the vicinity of a private airstrip or No Impact No mitigation required. <br /> an airport land use plan or,where such a plan has not been adopted, <br /> within two miles of a public airport or public use airport,would the <br /> project expose people residing or working in the project area to <br /> excessive noise levels? <br /> Griffith Energy Storage Project ES-28 Tetra Tech/SCH2022120675 <br /> Draft Environmental Impact Report August 2023 <br />