My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br /> Level of <br /> Potential Impacts Significance Mitigation Measures <br /> PUBLIC SERVICES <br /> IMPACT 4.14-1: Would the project result in substantial adverse -- -- <br /> physical impacts associated with the provision of new or physically <br /> altered government facilities, need for new or physically altered <br /> government facilities, the construction of which would cause <br /> significant environmental impacts, in order to maintain acceptable <br /> service ratios, response times or other performance objectives for any <br /> of the public services: <br /> i) Fire protection? Less than No mitigation required. <br /> Significant Impact <br /> ii) Police protection? Less than No mitigation required. <br /> Significant Impact <br /> iii) Schools? No Impact No mitigation required. <br /> iv) Parks? No Impact No mitigation required. <br /> V) Other public facilities? No Impact No mitigation required. <br /> TRANSPORTATION <br /> IMPACT 4.15-1: Would the project conflict with a program, plan, Less than No mitigation required. <br /> ordinance, or policy addressing the circulation system, including Significant Impact <br /> transit, roadway, bicycle and pedestrian facilities? <br /> IMAPCT 4.15-2:Would the project conflict or be inconsistent with Less than No mitigation required. <br /> CEQA Guidelines 15064.3, subdivision (b)? Significant Impact <br /> IMPACT 4.15-3:Would the project substantially increase hazards due Less than No mitigation required. <br /> to a geometric design feature(e.g., sharp curves or dangerous Significant Impact <br /> intersections)or incompatible uses(e.g.,farm equipment)? <br /> IMPACT 4.15-4: Would the project result in inadequate emergency Less than No mitigation required. <br /> access? Significant Impact <br /> TRIBAL RESOURCES <br /> IMPACT 4.16-1:Would the project cause adverse change in the Less than Implementation of Mitigation Measures CUL-1 and CUL-2 would be required. <br /> significance of a tribal cultural resource, defined in Public Resource Significant Impact <br /> Code Section 21074 as either a site,feature, place, cultural landscape with Mitigation <br /> that is geologically defined in terms of the size and scope of the Incorporated <br /> landscape, sacred plan, or object with cultural value to a California <br /> Native American tribe that is: <br /> Griffith Energy Storage Project ES-29 Tetra Tech/SCH2022120675 <br /> Draft Environmental Impact Report August 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.