Laserfiche WebLink
Executive Summary <br /> Level of <br /> Potential Impacts Significance Mitigation Measures <br /> IMPACT 4.18-2: Due to slope, prevailing winds, and other factors, Less than No mitigation required. <br /> would the project exacerbate wildfire risks, and thereby expose project Significant Impact <br /> occupants to, pollutant concentrations from a wildfire or the <br /> uncontrolled spread of a wildfire? <br /> IMPACT 4.18-3: If located in or near state responsibility areas or Less than No mitigation required. <br /> lands classified as very high fire hazard severity zones,would the Significant Impact <br /> project require the installation or maintenance of associated <br /> infrastructure(such as roads,fuel breaks, emergency water sources, <br /> power lines or other utilities)that may exacerbate fire risk or that may <br /> result in temporary or ongoing impacts to the environment? <br /> IMPACT 4.18-4: If located in or near state responsibility areas or Less than Implementation of Mitigation Measure GEO-1 would be required. <br /> lands classified as very high fire hazard severity zones,would the Significant Impact <br /> project expose people or structures to significant risks, including with Mitigation <br /> downslope or downstream flooding or landslides, as a result of runoff, Incorporated <br /> post-fire slope instability, or drainage changes? <br /> Griffith Energy Storage Project ES-31 Tetra Tech/SCH2022120675 <br /> Draft Environmental Impact Report August 2023 <br />