Executive Summary <br /> facilities would be sited on three terraces with approximately the same final footprint as the <br /> Project. Site preparation would require 472,822 cubic yards of cut (65,898 cubic yards more <br /> than the Project) and 476,911 cubic yards of fill (71,270 cubic yards more than the Project), <br /> as shown in Figure 3-1. <br /> ,�c Northern Site Alternative: The Northern Site Alternative would relocate the Project to the <br /> parcel north of the Project site and north of West Patterson Pass Road, which consists of a <br /> parcel approximately 142 acres in size, shown in Figure 3-2. <br /> AREAS OF CONTROVERSY <br /> Areas of controversy were identified through written agency and public comments received during <br /> the scoping period. Public comments received during the scoping period are provided in <br /> Appendix A. In summary, the following issues were identified during scoping and are <br /> addressed in the appropriate sections of Chapter 4, Environmental Setting, Impacts, and <br /> Mitigation Measures: <br /> cc Impacts related to air quality <br /> oc Impacts related agricultural resources <br /> oc Impacts to hydrology and water quality resources <br /> oc Impacts related to wildfire <br /> Griffith Energy Storage Project ES-4 Tetra Tech/SCH 2022120675 <br /> Draft Environmental Impact Report August 2023 <br />