My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
4600
>
1600 - Food Program
>
PR0548605
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 11:31:43 AM
Creation date
9/5/2023 11:24:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0548605
PE
1617
FACILITY_ID
FA0027795
FACILITY_NAME
VALLEY FUELS INC
STREET_NUMBER
4600
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
4600 S CORRAL HOLLOW RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> ® Anthon � Model 401 & 403 Pass-Thru <br /> y Service and Installation Instructions <br /> •�. 99-21972-S001 Rev. A <br /> d. Continue to step 7. <br /> e. Place the plastic extrusion notch toward the top of the Mullion. <br /> Vertical <br /> Mullion <br /> Plastic Shield <br /> f. Using a Phillips screw driver, thread a #8 tapping screw through <br /> the plastic extrusion. <br /> Plastic <br /> Shield <br /> 0''S Verticle Mullion <br /> at CIL <br /> g. Continue to step 7. <br /> 7. Position the center punch directly over the vertical line and within the plastic <br /> extrusion notched cutout, establish a dimple. <br /> - Plastic <br /> � Shield <br /> Vertical <br /> Mullion <br /> 8. <br /> 8. Use a power drill and (3/8") 0.375" dia. drill bit, drill (1) hole. <br /> 9. Snap the LED fixture into the plastic extrusion. Refer to "Wiring Diagrams and <br /> Orientation" and "Parts List". <br /> 10.Thread the LED wires through the 3/8" hole. <br /> 11.Align the LED fixture with the vertical lines made in step 2 and using a center <br /> punch, establish two dimples, one at the top and one at the bottom of the end <br /> clips. <br /> 12.Use a power drill and (1/8") 0.125" dia. drill bit. Drill (2) holes through the LED <br /> top and bottom mounting brackets through the plastic extrusion. <br /> d.,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.