My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 3 EARTHWORK <br /> 2. Particle size control tests by the EARTHWORK CONTRACTOR shall be made on samples taken at the place of production prior to shipment. Samples for particle size control testing shall be taken in accordance with the frequency listed in Table 02300-1 or more often as determined by the QA/QC CONSULTANT, if variation in gradation is occurring, or if the material appears to depart from the Specifications. 3. If during placement of the material, control tests conducted by the EARTHWORK CONTRACTOR or the acceptance tests conducted by the QA/QC CONSULTANT indicate that the material does not meet Specification requirements, material placement will be terminated until corrective measures are taken. Material that does not conform to the Specification requirements and is placed in the Work shall be removed and replaced at the EARTHWORK CONTRACTOR's sole expense. Sampling and control testing performed by the EARTHWORK CONTRACTOR shall be done at the EARTHWORK CONTRACTOR's sole expense. 4. All materials shall meet specifications whether from samples taken from borrow sources or materials placed in the field. Materials for which borrow source samples meet Specification requirements but field samples taken do not, shall be rejected, removed and replaced at the EARTHWORK CONTRACTOR's sole expense. 5. Table 02300-1 summarizes control testing frequencies required for each imported component. The EARTHWORK CONTRACTOR shall perform all imported material control testing for imported materials supplied by the EARTHWORK CONTRACTOR. <br />Table 02300-1 Imported Material Control Testing Frequency <br /> <br />Test <br />(ASTM Designation) <br /> <br />Granular Drainage <br />Material (cy) <br /> <br />Coarse Gravel <br />(cy) <br />Particle Size (ASTM D422) 5,000 500 <br />Laboratory Hydraulic Conductivity (ASTM <br />D2434) <br />5,000 500 <br />Soil Classification (ASTM D2488, D2487) Continuous Continuous <br /> B. Imported materials hauled by the EARTHWORK CONTRACTOR to the Project site shall be protected by the EARTHWORK CONTRACTOR from precipitation, inundation, and contamination by dust or other materials until they are placed in their completed and compacted course. <br /> <br /> <br />1.5 LIMIT OF EQUIPMENT ACCESS <br /> <br /> A. To avoid damaging the existing liner systems, equipment access on the existing <br />WMUs shall be restricted as directed by the QA/QC CONSULTANT and the <br />OWNER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.