<br /> <br /> Forward Landfill WMU FU-23 02300 3 EARTHWORK <br /> 2. Particle size control tests by the EARTHWORK CONTRACTOR shall be made on samples taken at the place of production prior to shipment. Samples for particle size control testing shall be taken in accordance with the frequency listed in Table 02300-1 or more often as determined by the QA/QC CONSULTANT, if variation in gradation is occurring, or if the material appears to depart from the Specifications. 3. If during placement of the material, control tests conducted by the EARTHWORK CONTRACTOR or the acceptance tests conducted by the QA/QC CONSULTANT indicate that the material does not meet Specification requirements, material placement will be terminated until corrective measures are taken. Material that does not conform to the Specification requirements and is placed in the Work shall be removed and replaced at the EARTHWORK CONTRACTOR's sole expense. Sampling and control testing performed by the EARTHWORK CONTRACTOR shall be done at the EARTHWORK CONTRACTOR's sole expense. 4. All materials shall meet specifications whether from samples taken from borrow sources or materials placed in the field. Materials for which borrow source samples meet Specification requirements but field samples taken do not, shall be rejected, removed and replaced at the EARTHWORK CONTRACTOR's sole expense. 5. Table 02300-1 summarizes control testing frequencies required for each imported component. The EARTHWORK CONTRACTOR shall perform all imported material control testing for imported materials supplied by the EARTHWORK CONTRACTOR. <br />Table 02300-1 Imported Material Control Testing Frequency <br /> <br />Test <br />(ASTM Designation) <br /> <br />Granular Drainage <br />Material (cy) <br /> <br />Coarse Gravel <br />(cy) <br />Particle Size (ASTM D422) 5,000 500 <br />Laboratory Hydraulic Conductivity (ASTM <br />D2434) <br />5,000 500 <br />Soil Classification (ASTM D2488, D2487) Continuous Continuous <br /> B. Imported materials hauled by the EARTHWORK CONTRACTOR to the Project site shall be protected by the EARTHWORK CONTRACTOR from precipitation, inundation, and contamination by dust or other materials until they are placed in their completed and compacted course. <br /> <br /> <br />1.5 LIMIT OF EQUIPMENT ACCESS <br /> <br /> A. To avoid damaging the existing liner systems, equipment access on the existing <br />WMUs shall be restricted as directed by the QA/QC CONSULTANT and the <br />OWNER. <br />