Laserfiche WebLink
<br /> <br /> Forward Landfill WMU FU-23 02300 4 EARTHWORK <br />1.6 WATER FOR COMPACTION AND MOISTURE CONTROL <br /> <br /> A. Water for use in compaction and dust control will be provided to the <br />EARTHWORK CONTRACTOR at Forward's well standpipe as shown on the <br />Construction Drawings. The EARTHWORK CONTRACTOR shall be <br />responsible for transport of water from well. <br /> <br />1.7 SHORING, SHEETING, BRACING, AND SLOPING <br /> <br /> A. Install and maintain shoring, sheeting, bracing, and sloping necessary to support <br />the sides of excavations, to keep and to prevent any movement that may damage <br />adjacent facilities, or endanger life and health. Install and maintain shoring, <br />sheeting, bracing, and sloping as required by OSHA and other applicable <br />governmental regulations and agencies. <br /> <br />1.8 EXCAVATION SAFETY <br /> <br /> A. The EARTHWORK CONTRACTOR shall be solely responsible for making all <br />excavations in a safe manner. Provide appropriate measures to retain excavation <br />side slopes and prevent rock falls to ensure that persons working in or near the <br />excavation are protected. <br /> <br />1.9 CODES, ORDINANCES, AND STATUTES <br /> <br /> A. The EARTHWORK CONTRACTOR shall be familiar with, and comply with, all <br />applicable codes, ordinances, statutes, and bear sole responsibility for the <br />penalties imposed for noncompliance. <br /> <br />1.10 TOLERANCES <br /> <br /> A. All material limits shall be constructed within the tolerances specified in Section <br />01410, SURVEYS. Minimum thicknesses and slopes shall be as shown on the <br />Construction Drawings. All grading shall be performed to maintain slopes and <br />drainage as shown. No reverse slopes will be permitted. <br /> <br />PART 2 PRODUCTS <br /> <br />2.1 GENERAL <br /> <br /> A. Provide all labor, materials, and equipment necessary to accomplish the Work <br />specified in this section. <br /> <br />2.2 GENERAL EARTHFILL <br /> <br /> A. General Earthfill material shall be used where indicated on the Construction <br />Drawings and to bring subgrade to required grade where no other material is <br />specified.