<br /> <br /> Forward Landfill WMU FU-23 02300 19 EARTHWORK <br />3.10 COARSE GRAVEL MATERIAL <br /> <br /> A. General Requirements: Coarse Gravel shall be placed around leachate collection <br />pipe and in sump area as shown on the Construction Drawings and should be fully <br />encapsulated by geotextile. <br /> <br /> B. Coarse Gravel Placement: <br /> 1. The HDPE geomembrane lining underlying the Coarse Gravel shall be <br />inspected and approved prior to placement of the Coarse Gravel. <br />2. Equipment used to place and compact the coarse gravel shall be not travel <br />directly on the underlying geomembrane. <br />3. The EARTHWORK CONTRACTOR shall use low ground pressure <br />equipment to place the coarse gravel. A minimum thickness of 1 ft of <br />material is required between a low ground pressure dozer (such as a wide <br />pad Caterpillar D-3 bulldozer or equivalent) and an underlying geoembrane. <br /> A minimum thickness of 3 ft of material is required between rubber-tired <br />vehicles and underlying geosynthetics. In areas of heavy vehicle traffic, <br />such as access ramps, the material thickness should be at least 3 ft. In any <br />case, the following table shall be complied with during construction: <br /> <br />Maximum <br />Equipment Ground Pressure <br />(psi) <br /> <br />Initial Lift Thickness <br />(ft) <br />< 5 0.5 <br />5 1.0 <br />10 1.5 <br />20 2.0 <br />>20 >3.0 <br /> <br /> 3. Method of dumping and spreading materials shall be approved by the <br />QA/QC CONSULTANT and shall ensure uniform distribution of the <br />material and prevent damage to the underlying geotextile and geomembrane <br />lining. Approval does not absolve the EARTHWORK CONTRACTOR of <br />responsibility for damage to underlying components. <br /> 4. Compaction of Coarse Gravel shall be accomplished by shovel-slicing <br />during dumping and taking necessary precautions to prevent damage to <br />underlying geosynthetics. <br />