My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 20 EARTHWORK <br /> C. Quality Control: <br /> <br /> 1. General: As the Coarse Gravel material is being placed, the QA/QC <br />CONSULTANT will be monitoring the construction activities and soil <br />properties. If acceptance tests conducted by the QA/QC CONSULTANT <br />indicate that the Coarse Gravel does not meet specified requirements, the <br />EARTHWORK CONTRACTOR shall terminate material placement until <br />corrective measures are taken. <br /> 2. Coarse Gravel Acceptance: Final acceptance of the Coarse Gravel will be <br />based on all tests made on completed Work or on samples of material taken <br />from the completed layer. Testing for final acceptance shall be performed <br />by the QA/QC CONSULTANT in accordance with these Specifications and <br />the CQA Manual. <br /> <br /> D. Protection: <br /> <br /> 1. Do not route construction traffic on top of Coarse Gravel layer once <br />material has been placed. <br /> 2. Constructed Coarse Gravel layer shall be maintained to meet the <br />requirements of this Specification until final completion and acceptance of <br />the Work. This shall include all measures to prevent erosion. During <br />seasonal or other extended shutdowns, all exposed surfaces shall be <br />protected as detailed in Article 3.1, PROTECTION OF EXPOSED <br />SURFACES, of this Section. In addition, the Coarse Gravel shall be <br />protected from any contamination that reduces the hydraulic conductivity. <br />Any contaminated material shall be removed and replaced at no cost to the <br />OWNER. <br /> <br />3.11 CONSTRUCTION OF GRANULAR DRAINAGE MATERIAL <br /> <br /> A. General Requirements: <br /> <br /> 1. GDM shall be placed and compacted to the lines and grades shown on the <br />Construction Drawings or as required by the DESIGN ENGINEER. <br /> 2. The CONTRACTOR shall notify the OWNER at least 3 working days in <br />advance of when the granular drainage material is completed and ready for <br />as-built surveys. The OWNER will survey the top of the GDM within two <br />days of the layer being completed to determine that the required minimum <br />thickness has been achieved. The survey shall be performed in accordance <br />with Section 01410, SURVEYS, and shall provide coordinates and <br />elevations of the surface at the established 50-foot grid and delineating <br />prominent features such as the edge of GDM. The EARTHWORK <br />CONTRACTOR may use an alternative method for measuring the thickness <br />of the GDM, with prior written approval of the OWNER and QA/QC <br />CONSULTANT. The QA/QC CONSULTANT shall have 2 working days <br />to review survey results and may independently verify survey results. The <br />time taken by the CQA Team in checking and verifying the survey results <br />will be considered included in the total calendar days allotted the
The URL can be used to link to this page
Your browser does not support the video tag.