<br /> <br /> Forward Landfill WMU FU-23 02300 20 EARTHWORK <br /> C. Quality Control: <br /> <br /> 1. General: As the Coarse Gravel material is being placed, the QA/QC <br />CONSULTANT will be monitoring the construction activities and soil <br />properties. If acceptance tests conducted by the QA/QC CONSULTANT <br />indicate that the Coarse Gravel does not meet specified requirements, the <br />EARTHWORK CONTRACTOR shall terminate material placement until <br />corrective measures are taken. <br /> 2. Coarse Gravel Acceptance: Final acceptance of the Coarse Gravel will be <br />based on all tests made on completed Work or on samples of material taken <br />from the completed layer. Testing for final acceptance shall be performed <br />by the QA/QC CONSULTANT in accordance with these Specifications and <br />the CQA Manual. <br /> <br /> D. Protection: <br /> <br /> 1. Do not route construction traffic on top of Coarse Gravel layer once <br />material has been placed. <br /> 2. Constructed Coarse Gravel layer shall be maintained to meet the <br />requirements of this Specification until final completion and acceptance of <br />the Work. This shall include all measures to prevent erosion. During <br />seasonal or other extended shutdowns, all exposed surfaces shall be <br />protected as detailed in Article 3.1, PROTECTION OF EXPOSED <br />SURFACES, of this Section. In addition, the Coarse Gravel shall be <br />protected from any contamination that reduces the hydraulic conductivity. <br />Any contaminated material shall be removed and replaced at no cost to the <br />OWNER. <br /> <br />3.11 CONSTRUCTION OF GRANULAR DRAINAGE MATERIAL <br /> <br /> A. General Requirements: <br /> <br /> 1. GDM shall be placed and compacted to the lines and grades shown on the <br />Construction Drawings or as required by the DESIGN ENGINEER. <br /> 2. The CONTRACTOR shall notify the OWNER at least 3 working days in <br />advance of when the granular drainage material is completed and ready for <br />as-built surveys. The OWNER will survey the top of the GDM within two <br />days of the layer being completed to determine that the required minimum <br />thickness has been achieved. The survey shall be performed in accordance <br />with Section 01410, SURVEYS, and shall provide coordinates and <br />elevations of the surface at the established 50-foot grid and delineating <br />prominent features such as the edge of GDM. The EARTHWORK <br />CONTRACTOR may use an alternative method for measuring the thickness <br />of the GDM, with prior written approval of the OWNER and QA/QC <br />CONSULTANT. The QA/QC CONSULTANT shall have 2 working days <br />to review survey results and may independently verify survey results. The <br />time taken by the CQA Team in checking and verifying the survey results <br />will be considered included in the total calendar days allotted the