My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Forward Landfill WMU FU-23 02535 5 PIPES AND TANKS <br />by the DESIGN ENGINEER. <br /> <br /> B. The EARTHWORK CONTRACTOR shall construct at least one temporary pipe <br />crossing point within the WMU to provide access for necessary construction <br />traffic. These temporary crossing points shall be located by the EARTHWORK <br />CONTRACTOR and shall consist at a minimum of the completed Coarse Gravel <br />and Granular Drainage Material Components, and a minimum of 2.5 feet of <br />Protective Operations Layer extending a minimum of 4 feet from the centerline of <br />the pipe in each direction. <br /> <br />3.9 HDPE TANKS <br /> <br /> A. Care shall be taken during the placement of each tank to not damage the <br />underlying geomembrane within each sump. Damage to the geomembrane <br />incurred during placement of the tanks shall be repaired at the EARTHWORK <br />CONTRACTOR’s sole expense. <br /> <br /> B. Clay earthfill shall be compacted around the HDPE tanks in accordance with <br />Section 02300, EARTHWORK, and as shown on the Construction Drawings. <br />Handheld equipment may be necessary to obtain adequate compaction of the clay <br />earthfill around the tank. <br /> <br /> <br /> <br /> <br />PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br />AND PAYMENT PROCEDURES) <br /> <br /> END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.