My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Forward Landfill WMU FU-23 ATTACHMENT A 2 LEAK LOCATION TESTING <br />the artificial leak. The lines shall be centered on the artificial leak and extend at least 20 feet in front and behind the artificial leak. This data is the leak signal plus noise signal (S+N). 4. The recorded leak location data shall be examined to determine the peak-to-peak leak signal plus noise signal to background noise ratio R=(S+N)/BN for each of the recorded data lines. The measured leak signals must have characteristics of a leak. Wild data points that deviate from the theoretical leak signals shall not be used to determine R. 5. The two farthest lateral lines of data with an R value greater than 3.0 shall be noted. The average of the lateral distance from the leak for these two lines is defined to be the leak detection distance for the artificial leak 6. If unfavorable site conditions prevent obtaining an R ratio of 3.0 from being obtained, the leak location equipment shall be demonstrated to be able to detect an artificial leak from a smaller distance no less than 1 foot to verify that the leak location equipment is operational. <br /> <br />PART 3 LEAK LOCATION SURVEY <br /> <br /> <br />3.1 PREPARATION <br /> A. The EARTHWORK CONTRACTOR shall uniformly wet the bare geomembrane with an equivalent of 0.2-inches of water prior to the leak location survey B. The EARTHWORK CONTRACTOR shall uniformly wet the granular drainage material to field capacity. C. The GEOSYNTHETICS CONTRACTOR shall terminate the edge of geomembrane so that it is electrically isolated from earth ground. This requires leaving the geomembrane bare around a narrow strip around the perimeter of the geomembrane test area. D. The CONTRACTOR’S shall assist the Leak Location Contractor with other preparations that may be necessary to meet the performance requirements of the leak location survey. <br /> <br />3.2 LEAK SURVEY <br /> A. The leak location data shall be taken: 1. With a uniform measurement density of greater than one measurement every 10 square feet, or 2. On survey lines spaced no further apart than twice the leak detection distance determined for the artificial leak as discussed in Part 2. The measurement electrode spacing shall be no less than that used for the performance demonstration. The spacing between measurements shall be no more than that used for the performance demonstration. B. The data shall be recorded, plotted, and analyzed for leak signals. The positions of these leak signals shall be located and the leaks excavated. The leaks shall be repaired in accordance with the specified requirements for HDPE geomembrane. C. Following the repair, the leak location survey shall be repeated on the two closest survey lines for a distance extending 20 feet before and beyond the leak. If another leak signal is detected, the entire repair and resurvey process shall be
The URL can be used to link to this page
Your browser does not support the video tag.