Laserfiche WebLink
<br /> <br />Forward Landfill WMU FU-23 ATTACHMENT A 3 LEAK LOCATION TESTING <br />repeated until no additional leaks are detected. <br /> <br />3.3 REPORTING <br /> A. The daily results of the leak location survey shall be reported to the QA/QC CONSULTANT. B. A report documenting the electrical leak location survey shall be submitted within 7 days of the completion of each leak survey. The report shall document the methodology used, the locations and descriptions of the leaks, and a figure of the WMU showing the approximate leak locations. <br /> <br /> END OF ATTACHMENT A