My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward, Inc. - 2 - 6 November 2023 <br />Forward Landfill <br />The 2:1 side slope liner components of WMU FU-23 consist of the following, from top to <br />bottom: <br />• 12-inches thick protective operations layer <br />• Geocomposite drainage net <br />• 60-mil single sided textured (SST) HDPE geomembrane liner <br />• Geosynthetic clay liner (GCL) <br />• Subgrade <br />The CQA Report provides the results of field and laboratory CQA testing conducted <br />during installation of WMU FU-23’s containment system components. The report <br />includes detailed description of earthwork and LCRS testing and installation, such as <br />particle size analysis, hydraulic conductivity, relative compaction, and optimum water <br />content determination. CQA testing for geosynthetics layers, including GCL, <br />geomembrane, geocomposite, and geotextile, include receiving and deployment logs, <br />conformance tests, manufacture’s certification, and interface shear testing. Design <br />modifications, including changes to technical specifications and the submitted design <br />report, were also documented as well as other CQA activities and results. <br />CQA activities included a leak detection test of the base and side slope HDPE <br />geomembrane liner. Leak detection testing was conducted before and after installation <br />of the LCRS and operations layer. The methods used were the Water Puddle Method <br />(ASTM D7002) for the exposed HDPE geomembrane and the Dipole Method (ASTM <br />D7007) for the geomembrane covered with soil material. Repairs included one hole <br />found during the Water Puddle test. <br />The CQA Report includes a detailed description of the above CQA activities along with <br />project information such as construction specification; as-built survey drawings; daily <br />field reports and photographs; and LCRS piping survey map. <br />The following variances and revisions from the approved design plans were reviewed <br />and approved by the design firm, Lewis Engineering. These variances and revisions <br />include: <br />• The peel strength of the GCL did not meet the minimum specification of 10 <br />lbs/inch. The design firm assessed that the interface shear strength for <br />GCL/geotextile/geocomposite drainage net met the interface shear strength <br />test requirements and therefore the lower values for GCL peel strength are <br />acceptable. The design firm approved the design variation via stamp and <br />signature. <br />• The large-scale direct shear test results did not meet the specification for <br />interfaces and normal loads. The design engineer reviewed and approved the <br />results after reanalyzing the slope stability. <br />• The granular drainage material was out of specification. The sieve analysis <br />for the LCRS granular drainage material indicated 92% passing the 3/8‐inch <br />sieve and less than 3% passing the No. 200 sieve. The specification required
The URL can be used to link to this page
Your browser does not support the video tag.