My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2026 10:00:38 AM
Creation date
2/5/2025 8:03:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231173
PE
2361 - UST FACILITY
FACILITY_ID
FA0006423
FACILITY_NAME
Xpress Gas & Mart 4 Inc
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3440 E MAIN ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A dOAQU1N Environmental Health Department <br /> CQLJIVTY AMENDED <br /> 3/4/2025 <br /> CP22 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> NASHIR MAIN ST INC. 3440 E MAIN ST, STOCKTON Februa 12 2025 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> This is (Class 2)Violation. <br /> 56 CA Code of Regulations 2716(a-e)2030013-DO inspections completed at least every 30 days and meet all <br /> requirements(TCR 12). <br /> 1)OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The 12/13/2024 designated operator report was not signed by the owner/operator <br /> -The 01/10/2025 designated operator report was not signed by the owner/operator <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection,the <br /> designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 hours <br /> of being provided a signed copy of the report,the owner or operator shall provide a description of each corrective action <br /> taken or to be taken and shall sign and date the report, acknowledging the identified compliance issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> 2)OBSERVATION:The designated operator failed to check and note the correct test dates for the Overfill Prevention <br /> Equipment on the designated operator inspection reports. The date listed was 2/12/2024 but EHD has not received <br /> any test result or record of test notification for that date.The last record EHD has for Overfill Prevention Equipment is <br /> 3/12/2021. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of the <br /> required information on the reports. <br /> This is (Minor)Violation. <br /> 57 CA Code of Regulations 2715(c)2030012-Initial and annual training provided to employees and at least one trained <br /> employee is present. <br /> OBSERVATION:There was not a designated operator trained person on site.The designated operator employee <br /> training for Raush Yakobi was not performed. Raush Yakobi was the only employee on site.At the time of inspection, <br /> he has been employed for 1 week. <br /> REGULATION GUIDANCE:The designated operator shall train facility employees in the proper operation and <br /> maintenance of the UST system at least once every 12 months. The training shall be conducted before the individual <br /> performs the duties of a facility employees.The training shall include, but is not limited to: 1. Operation of the UST <br /> system in a manner consistent with the facility's best management practices 2. Employee's role with regard to <br /> monitoring equipment as specified in the facility's monitoring plan 3. Employee's role with regard to spills and overfills <br /> as specified in the facility's response plan 4. Name of the contact person(s)for emergencies and monitoring <br /> equipment alarms Initial training shall also include a site-specific practical demonstration that provides both sharing <br /> information and evaluating knowledge for responding to emergencies, leak detection, monitoring alarms, spills and <br /> FA0006423 PR0231173 SCO01 02/12/2025 <br /> EHD Rev.12/06/2021 Page 8 of 10 CP22-UST FULL OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.