Laserfiche WebLink
Fieldwork Documentation Field Standard Operating Procedure <br /> SWE-FSOP-001;Revision 1 Ahtna Southwest Environmental Operations <br /> The PL is responsible for all forms of field documentation, and scans of paperwork, digital records, and <br /> downloads from electronic devices are placed in the m:\\ drive project file. All original documents shall <br /> be assembled into a data package, submitted to the PL, and archived in the project file.The goal is that all <br /> documentation is organized by task/event and stored in a single location. <br /> 4.1.2 Problems in the Field and Variances from Project Plans <br /> Variances or problems encountered during the fieldwork that cannot be resolved promptly must be <br /> communicated promptly in writing to the FTL /Site Supervisor, who will notify the PL. This may be <br /> completed by sending a variance notice by email or other means to promptly communicate the variance <br /> or problem and allow for the continuation of the fieldwork. The PL shall provide written approval of <br /> recommended solutions or provide an approved alternate solution. <br /> The need for a corrective action addressing variances or problems in the field will be determined by the <br /> PL in collaboration with the FTL/Site Supervisor.The PL will notify the PgM and SWE Field QC Manager of <br /> any needed corrective action for their concurrence or follow-up. <br /> Documentation of variances to project plans, problems encountered, or corrective actions will be kept in <br /> the FLB/notepad or forms. <br /> 4.1.3 Field Logbook <br /> Field logbooks can be spiral-or adhesive-bound and are distributed by the PgM or designee.The cover of <br /> the FLB is labeled with the project number and name of the Installation/Site(s). <br /> The inside cover of the FLB contains the name, address, phone, and email address of the PgM and a list of <br /> projects the FLB is used to record.The information is updated if the project is assigned to another PgM. <br /> a <br /> * �% � y,.., Sommer Carter/Program Manager <br /> lr r a Ahrna—irnnm—M,Irr:. <br /> ii e'h'4 aii.11 � nddic- 2255 Contra Coxta Blvd. <br /> Jo17RNAL �, Guite]1l � <br /> k=Y%4w PI^asap'Hill,C,94523 <br /> � I <br /> � Ptwoo (9251 357-4750 I <br /> � �yttarrer@ahrno.net <br /> P* rJ&oSO PPRP a <br /> 144-1..P�#.T:RW Px.i,ix PfifT0.OG WaseCharactenxation 5[rdy <br /> '/�••�/ PR�n-o6 NTCRA <br /> � I <br /> a <br /> a <br /> RiteinaeRaln.com <br /> � J <br /> The FLB shall be project/task-specific.The Field Team uses the FLB to record details of their responsibility <br /> (e.g., sampling, QC, safety, oversight, etc.) and provide them to the FTL/Site Supervisor for their review <br /> before submitting daily QC reports (DQCRs). <br /> Page 8 of 15 <br />