My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
PR0542675
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 10:41:30 AM
Creation date
3/11/2025 2:50:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542675
PE
2954 - USEPA - SITE PROJECT
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
700 ROTH RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Well Development Field Standard Operating Procedure <br /> SWE-FSOP-602;Revision 1 Ahtna Southwest Environmental Operations <br /> responsible for approving and documenting techniques not described in this SOP but are considered the <br /> best methods for the current project. <br /> Safety Representative.The Safety Representative meets the experience and training requirements of the <br /> current version of U.S. Army Corps of Engineers EM-385-1-1 Safety and Health Requirements.The Safety <br /> Representative oversees site-specific health and safety activities and ensures compliance with the project <br /> requirements. The Safety Representative notifies the FTL of safety deficiencies and incidents and actions <br /> to correct those. If the circumstance warrants,the FTL approves those actions and notifies the PL and Site <br /> Safety and Health Officer for their approval. <br /> Quality Control Lead (QC Lead).The QC Lead ensures work inspections are performed using the 3-Phases <br /> of the Quality Control method described in the project work plans.The QC Lead notifies the PL of quality <br /> deficiencies and actions to correct those. The PL approves those actions or notifies the SWE Field QC <br /> Manager for their approval if the circumstance warrants involvement. <br /> 1.4 Definitions <br /> Bailer. A bottom-filling cylindrical tube with an open top and check valve at the bottom used to remove <br /> water and sediment from a borehole or well. <br /> Bailing. A well development technique uses a bailer raised and lowered in the well to create a strong <br /> inward and outward movement of water from the formation, break sand bridges, and remove water and <br /> fine-grained materials from the well. <br /> Extraction Well.A well designed to extract fluids(such as water,gas,free product,or a combination)from <br /> the subsurface. <br /> Field Documentation—The combination of field logbooks/notepads,field forms,digital/electronic forms, <br /> and other documentation in the project file. <br /> Field Forms — Any documentation that preserves an accurate historical record of field activities but is <br /> recorded on unbound paper. These forms should be referenced in the FLB. Each data entry field should <br /> have an entry or indicate that data for that field is not available or not required. <br /> [PFAS Project]: Record of field events will be maintained on loose paper(PFAS-free) secured on <br /> Masonite or aluminum clipboards. Plastic clipboards, binders, or spiral hard cover notebooks are not <br /> acceptable. Field logbooks are permanently assigned to a specific project. <br /> Field Logbook(FLB)—A portable, bound, weatherproof notebook with consecutively numbered pages. <br /> [PFAS Project]: Use field logbook made of standard/loose plain paper(non-weatherproof), held <br /> together by an aluminum or Masonite field clipboard. Alternatively, a spiral-bound notebook with <br /> non-weatherproof paper and/or cover can be used. <br /> Field Notepad—A unbound notepad or loose-leaf paper with consecutively numbered pages. <br /> Investigation Derived Waste(IDW). Waste that is generated in the process of investigating or examining <br /> a contaminated site. <br /> Page 5 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.