Laserfiche WebLink
Revised Quarterly Monitoring Report – <br />Fourth Quarter/Annual 2024 <br />www.arcadis.com <br />Revised - Forward Landfill 4Q24 Quarterly Mon Report 06262025 18 <br />One NOV was issued by the SJCEHD during the August 27, 2024, site visit regarding an erosion channel with <br />exposed waste observed on the slope west of the active face. In response to the NOV, Forward completed the <br />necessary actions specified in the NOV to bring the landfill back into compliance. In the notes of the September <br />24, 2024, inspection, it was documented that the violation for drainage and erosion control has been corrected. <br />Fourth Quarter 2024 <br />One NOV was issued during the November 19, 2024, inspection for the exposed glass on the northern portion of <br />WMU FU-08. In response to the NOV, Forward completed the necessary actions specified in the NOV to bring the <br />landfill back into compliance. <br />Two NOVs were issued during the December 31, 2024, inspection for litter observed on neighboring properties <br />and for no cover placed on the southern slope. <br />Regional Water Quality Control Board <br />No NOVs were issued by the RWQCB during the first or third quarters 2024. Two NOVs were issued by the <br />RWQCB during second quarter 2024 and three NOVs were issued during fourth quarter 2024. <br />Second Quarter 2024 <br />One NOV (RWQCB 2024b) was issued by the RWQCB on April 3, 2024, regarding failure to properly characterize <br />waste before disposal. A response to the NOV was submitted by Forward on May 6, 2024 (Forward 2024b). One <br />NOV (RWQCB 2024c) was issued by the RWQCB on April 18, 2024 regarding exposed waste/inadequate cover <br />soil on WMUs FU-06, FU-08, FU-10, FU-13, and FU-14. All corrective actions were completed by June 1, 2024. <br />Fourth Quarter 2024 <br />One NOV (RWQCB 2024d) was issued by the RWQCB on November 22, 2024, regarding a required update to <br />the financial assurance cost estimate to consider future costs associated with corrective action. The Financial <br />Assurance for Corrective Action was submitted to the RWQCB on March 3, 2025 (Arcadis 2025c). <br />One NOV (RWQCB 2024e) was issued by the RWQCB on December 11, 2024, regarding incomplete <br />winterization and application of alternate daily cover on exterior side slopes of the landfill, which drain to the <br />sedimentation basins and surface water (Little John’s Creek). A response to the December 11, 2024, NOV was <br />submitted by Forward on January 13, 2025 (Forward 2025a). Corrective actions were completed in December <br />2024. <br />One NOV (RWQCB 2024f) was issued by the RWQCB on December 17, 2024, regarding acceptance of non- <br />conforming waste. A response to the NOV was submitted by Forward on January 22, 2025 (Forward 2025b). <br />6.3 Waste Types and Quantities <br />The types and quantities of waste handled during the first through third quarters 2024 were previously <br />documented by Arcadis (2024c, 2024g, 2024k); data for fourth quarter 2024 are presented in Section 4.4.1. The <br />types and quantities of waste for each quarter in 2024, and the totals for the entire year, are summarized in the <br />Table 6-3 below. The approximate waste placement areas for all four quarters were WMUs FU-13, FU-19, and <br />FU-23, and a figure showing these areas is included in Appendix F. <br />In accordance with MRP Section E.2.g (RWQCB 2024a), Appendix H presents two figures. The first figure <br />provides an isopach comparing the 2024 and 2025 topographic map. The areas in blue on the existing landfill