My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 7-14-25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 7-14-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 11:23:45 AM
Creation date
9/11/2025 4:17:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 7-14-25
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North County RC&SL Page 24 of 64 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin – Revised July 14, 2025 <br />At completion, the height of the landfill will not exceed 320 ft elevation without written <br />approval by jurisdictional agencies. <br /> <br />5.3 CONSTRUCTION SEQUENCING PLANS <br />Because sizing of the areas is dependent on many operational issues, such as anticipated waste <br />stream and capital cost expenditures, the actual size and configuration of each Lined Area will be <br />adjusted by the County to meet the needs of the County. <br /> <br />5.3.1 Excavation and Stockpiling Plans <br />An excavation plan and a stockpile plan will be incorporated into the design of each area. <br />Excavation plans will include the earthwork slopes and base grades, liner limits, LCRS systems, <br />perimeter berms, haul ramps, drainage ditches and storm water basins, and locations of ancillary <br />facilities. The stockpile plans will show the location and grading contours for temporary <br />placement of the surplus soils. <br /> <br />The County may seek to lease land adjacent to the landfill property for the placement of an <br />interim stockpile for soil needed for closure. <br /> <br />Near the end of landfill development, particularly for Area 11, stockpiling may occur on the top <br />deck of previously constructed areas that have been filled to interim heights. Soil may also be <br />stockpiled north of the refuse fill in non-wetland mitigation areas. <br /> <br />5.3.2 Base Preparation and Liner Placement Plans <br />The base of each lined area will provide drainage to a sump, from which leachate will be removed <br />(Appendix B, Drawing 2). The sump for each area will be located on the permanent exterior edge <br />of the landfill. This will allow access to the leachate sump via a side slope leachate riser. <br /> <br />Each lined area will be separately designed and submitted for approval based on the <br />requirements of the regulations and permits (including WDRs) in effect at the time of submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.