Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2010-0016 -41- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />NORTH COUNTY LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br /> <br />groundwater monitoring) <br />1) Annual estimate <br />2) 30-year estimate <br />c. Corrective Action – Lump sum cost estimate for corrective action measures <br />to address a known or reasonably foreseeable release per Title 27 Section <br />22220(b). <br /> <br />Copies of the updated PCMP shall also be provided to the Local Enforcement <br />Agency and the CIWMB. <br /> <br />10. The Discharger shall obtain and maintain assurances of financial responsibility <br />that comply with Title 27, Sections 22207 (Closure Fund), 22212 (Post-Closure <br />Fund), and 22220 et seq. (Corrective Action Fund) and 40 CFR parts 257 and <br />258. The financial assurance (F/A) instruments(s) shall be submitted to the <br />CIWMB, Financial Assurance Division, which determines if the instrument(s) <br />meet the requirements of Chapter 6, Title 27. The Discharger shall provide <br />adequate funding for the following: <br />a. Landfill closure in at least the amount of the minimum fund balance <br />required by the CIWMB under Section 22225 based on current approved <br />closure cost estimates under Provision E.25.a; <br />b. Landfill postclosure maintenance and monitoring in at least the amount of <br />the approved cost estimates under Provision E.25.b; and <br />c. Corrective action in at least the amount of the approved cost estimate <br />under Provision E.25.c. <br /> <br />11. Within 120 days of adoption of this Order, the Discharger shall submit to the <br />Executive Officer evidence that instrument(s) or mechanism(s) are in place for <br />required F/As under this Order (i.e., closure, post-closure maintenance, and <br />corrective action). The most recent acceptance letter from the CIWMB, <br />Financial Assurance Division (required to be included in the Annual Report <br />submitted under MRP Section H.2.e.iii) may suffice for this purpose. <br />By 30 November 2010 and every five years thereafter (or earlier if requested <br />by the Executive Officer), the Discharger shall also submit for the Executive <br />Officer’s review and approval a report as to the status of required F/As. The <br />report shall identify the following: <br />a. Required F/As for the facility, including type and current amount; <br />b. F/A instrument(s) or mechanism(s) provided to satisfy the required F/As; <br />c. Validity and ongoing viability of instrument(s)/mechanism(s) in D.4.b, <br />including any needed changes.