My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_20026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_20026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 9:52:02 AM
Creation date
1/21/2026 9:50:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
20026
RECORD_ID
PR0543574
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024750
FACILITY_NAME
Harney Lane 76
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
141 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of CP22 - UST FULL violations that have not been <br />addressed for Harney Lane 76 as of January 15, 2026. <br />Open violations from July 17, 2025 inspection <br />Violation #53 - 2010007 - Submitted/maintained current Cert of Financial Responsibility/mech of financial <br />assurance (TCR 11). <br />OBSERVATION: Current financial responsibility documents were not found on site. <br />REGULATION GUIDANCE: A copy of current financial responsibility documents are required to be maintained on site . <br />CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br />copy on site. <br />OBSERVATION: Financial responsibility documents have not been submitted to the EHD. The Letter from Chief <br />Financial Officer is missing in CERS. Section B of the Certification of Financial Responsibility document is left blank. <br />REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br />CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS) at <br />http://cers.calepa.ca.gov/, and upload the required documents. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Violation #56 - 2030013 - DO inspections completed at least every 30 days and meet all requirements (TCR <br />12). <br />OBSERVATION: A change in ownership took place on September 20, 2024. The designated operator inspections were <br />not conducted until March 24, 2025. (185 days) <br />REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br />the previous inspection. <br />CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time frames. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Page 4 of 7
The URL can be used to link to this page
Your browser does not support the video tag.