My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
950
>
2900 - Site Mitigation Program
>
PR0547725
>
CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:13:42 PM
Creation date
2/17/2026 11:17:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
CORRESPONDENCE
RECORD_ID
PR0547725
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027181
FACILITY_NAME
PROPOSED MONITORING WELL SITE
STREET_NUMBER
950
STREET_NAME
STEWART
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
2121007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
950 STEWART RD LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required, c) use of tremmie delivery, and d) proper placement of the grout throughout the entire length (no <br /> bridging) <br /> 3. EHD has to be on site to verify the a-log on the test hole to a)targeted depths, and b) if the test hole is to be <br /> converted into the well as plan, or does it need to be destroyed as a test hole and a new well to be re-drilled at a <br /> separate location. <br /> Depending on the situation, the inspector does not have to be on site during the entire length of the grouting as long as <br /> the above items are met. Nevertheless the inspector reserves the right to be on site as she needs to verify the permit <br /> conditions are met. Therefore,the inspector time on site is not limited by the applicant. <br /> Best Regards <br /> Jeff <br /> From: ehsitemitigation [EHD] <br /> Sent:Tuesday,July 11, 2023 11:25 AM <br /> To: 'Andrew Francis' <afrancis@lsce.com>; ehsite mitigation [EHD] <ehsitemitigation@slgov.org> <br /> Cc: Eddy Teasdale<eteasdale@lsce.com>; rodb@bradleVandsonsdrilling.com; Gregory Gibson <br /> <ggibson@ci.lath rop.ca.us> <br /> Subject: RE: City of Lathrop ASR Test Hole/Monitoring Well#2 <br /> Andrew: <br /> Please provide payment receipt/verification <br /> Best Regards, <br /> Jeff <br /> From:Andrew Francis<afrancis@lsce.com> <br /> Sent:Tuesday,July 11, 2023 10:38 AM <br /> To: ehsitemitigation [EHD] <ehsitemitigation@slgov.org> <br /> Cc: Eddy Teasdale<eteasdale@lsce.com>; rodb@bradlevandsonsdriIling.com; Gregory Gibson <br /> <ggibson@ci.lath rop.ca.us> <br /> Subject: RE: City of Lathrop ASR Test Hole/Monitoring Well#2 <br /> Jeff, <br /> I have attached our revised work plan, signed permit, and a letter stating you will be notified prior to the placement of <br /> the sanitary or surface seal. <br /> Fees were paid on 7/7. <br /> Thanks, <br /> Andrew <br /> From: ehsitemitigation [EHD] <ehsitemitigation@sigov.org> <br /> Sent: Friday,July 7, 2023 10:20 AM <br /> To:Andrew Francis<afrancis@Isce.com>; ehsitemitigation [EHD] <ehsitemitigation@sigov.org> <br /> Cc: Eddy Teasdale<eteasdale@lsce.com>; rodb@bradleVandsonsdriIling.com; Gregory Gibson <br /> <ggibson@ci.lathrop.ca.us> <br /> Subject: RE: City of Lathrop ASR Test Hole/Monitoring Well#2 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.