Denmar US 19113.000.001 <br /> American Soda Ash Terminal at Port of Stockton December 3, 2021 <br /> PRELIMINARY DEWATERING ANALYSIS Page 2 <br /> MODELING METHODOLOGY <br /> To evaluate dewatering flow rates and approximate impacts, we performed modeling in the <br /> three-dimensional finite difference groundwater modeling software MODFLOW. We reviewed the <br /> logs of four CPTs (1-CPT-7, 2-CPT-29, 2-CPT-30, and 2-DPT-43) and one boring (2-139)that were <br /> performed in the area of the Railcar Unloading Building (See Reference 2). Based on these <br /> explorations, we created the following idealized stratigraphy. <br /> TABLE 1: Idealized Subsurface Profile <br /> MODELGEOLOGIC ELEVATION <br /> LAYER (feet) <br /> 1 Lean Silty Clay 0 to -12 <br /> 2 Sand and Silty Sand -12 to -28 <br /> 3 Fat Sandy Clay -28 to -35 <br /> 4 Sand and Silty Sand -35 to -41 <br /> 5 Lean Silty Clay -41 to -60 <br /> Based on information on the logs, our experience with soil in the project area, and the Department <br /> of Water Resources' Guidance Document for Geotechnical Analyses (Reference 4), we assigned <br /> the following parameters for modeling. <br /> TABLE 2: MODFLOW Groundwater Modeling Parameters <br /> MODELHORIZONTAL HYDRAULIC • - • - <br /> LAYER CONDUCTIVITY, <br /> 1 0.0028 4 <br /> 2 2.8 4 <br /> 3 0.028 4 <br /> 4 2.8 4 <br /> 5 0.0028 4 <br /> In our analyses,we assumed that groundwater is at Elevation -5 feet(or 5 feet below existing grade). <br /> We performed a steady-state analysis to estimate the long-term pumping rates assuming a soldier <br /> pile and wood lagging system and a sheet pile system. We performed analyses varying the <br /> permeability of various layers to evaluate the impact of varying conditions on flow rates. When we <br /> evaluated the sheet piles,we assumed they are essentially impervious; our experience indicates that <br /> sheet piles often leak at the seams and either care should be used to align and seal the seams during <br /> construction or the contractor should expect to need to capture additional flow at leaking seams that <br /> will need to be captured and discharged in addition to the values estimated. With the sheet piles, we <br /> performed two analyses, the first assuming that the sheets are embedded approximately 5 feet into <br /> Layer 5 (referred to as the "deep sheet pile" analysis) and the second assuming that most of the <br /> sheets are terminated in Layer 3 and only sheets near the deeper part of the excavation are <br /> terminated in Layer 5 (referred to as the "hybrid sheet pile" analysis); in order for this hybrid sheet <br /> pile analysis to be successful, the presence, depth, and continuity of Layer 3 will need to be verified <br /> prior to construction. <br />