My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3230
>
2900 - Site Mitigation Program
>
PR0548573
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 1:10:34 PM
Creation date
2/23/2026 1:07:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548573
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027771
FACILITY_NAME
7-ELEVENT STORE #41256
STREET_NUMBER
3230
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95206
APN
11708017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3230 N WEST LN STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE-SPECIFIC HEALTH AND SAFETY PLAN FOR PHASE II ENVIRONMENTAL SITE ASSESSMENT <br /> Emergency Response <br /> July 7, 2023 <br /> • Please see Section 1.6 for incident reporting procedures. <br /> 1.5.3 Death of an Individual or Hospitalization of Three or More Employees <br /> The emergency response procedures above will be followed. If the injured person dies, follow the <br /> incident reporting procedures. PRM will notify the Human Resources Department, local officials and <br /> coroner immediately. Human Resources will notify the local OSHA office within 8 hours of the incident or <br /> fatality in the event of a fatality or the hospitalization of three or more employees. <br /> 1.6 EMERGENCY RESPONSE PROCEDURES: SPILLS OR CUT <br /> LINES <br /> Prevent problems by documenting the location of underground lines (e.g., product, sewer, telephone, <br /> fiber optic) before starting site work. If a line or tank is drilled through, or another leak occurs, document <br /> the event as soon as possible using the Incident Investigation Report. <br /> In the event of a spill/release, follow this plan: <br /> • Stop Work, stabilize the situation, and secure the site. <br /> • Call Fire Department immediately if the spill cannot be contained or in case of fire or other <br /> emergency. <br /> • Stay upwind of the spill/release. <br /> • Wear appropriate PPE. <br /> • Turn off equipment and other sources of ignition. <br /> • Turn off pumps and shut valves to stop the flow/leak. <br /> • Plug the leak or collect drippings, when possible. <br /> • Use sorbent pads to collect product and impede its flow, if possible. <br /> • Notify the SHSO to begin the incident reporting procedures. All spills/releases will be reported to <br /> the Client Project Manager within 24 hours. <br /> • Determine if the client wants Stantec to repair the damage or if the client will use an emergency <br /> repair contractor. <br /> • Based on agreements, contact emergency spill contractor for containment of free product. The <br /> contacts for this project will be the local fire department and/or American Integrated Services <br /> (888)423-6060 or 911. <br /> Stantec <br /> 1.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.