My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
2900 - Site Mitigation Program
>
PR0541231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 9:53:04 AM
Creation date
2/27/2026 9:19:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541231
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0023619
FACILITY_NAME
FORMER QUALITY CLEANERS TRACY CORNERS SHOPPING CENTER
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418041
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3081 N TRACY BLVD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
549
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2.2 Workplan Implementation (Partner) <br /> The proposed fieldwork shall be supervised by a California Professional Geologist (PG) or Professional <br /> Engineer (PE) provided by Partner. Partner's project team and associated responsibilities are described <br /> below. <br /> Project Manager <br /> The Project Manager (PM), Debbie Soukup, Ph.D., will have the overall responsibility for the <br /> implementation of the QA/QC measures included in this QA/QC Plan. The PM is responsible for the <br /> overall design and implementation of the project including development of the Workplan and assuring <br /> that the field methods and analytical methods including in the Sampling and Analysis Plan (SAP) are <br /> appropriate for acquiring the necessary data. The SAP is included in Appendix B. <br /> Dr. Soukup has the technical expertise in project management, regulatory compliance, and hazardous <br /> substance site cleanup sufficient to fulfill his responsibilities and shall be responsible for overseeing the <br /> implementation of the VCA and for designating a person to act in his absence. All communications <br /> between DTSC and Proponent, and all notices, documents and correspondence concerning the activities <br /> performed pursuant to this Agreement shall be directed through the Project Managers. <br /> Field Project Manager(FPM) <br /> The Field Project Manager (FPM), Dan Monteverde, is responsible for ensuring that the field activities are <br /> performed in accordance with the Workplan, SAP and the QAPP. Specific responsibilities of the FPM <br /> include: <br /> • Communication of project objectives with members of the project team; <br /> • Communication with representatives of the analytical laboratory to ensure that project data <br /> quality objectives are met; <br /> • Distribution and review of the Workplan, SAP, and QAPP with members of the project team; and <br /> • Answering questions regarding field activities and the sampling program. <br /> Additionally, the FPM is responsible for notifying the PM of any deviations from the Workplan QAPP, or <br /> SAP that occur during field activities as well as the reason for those deviations. <br /> Project Health and Safety Officer(PHSO) <br /> The Project Health and Safety Officer (PHSO), Dan Monteverde, is responsible for preparation, <br /> implementation and updating of the site specific Health and Safety Plan (HASP). This HASP will conform to <br /> applicable regulatory requirements including, but not limited to, Section 29 of the Code of Federal <br /> Regulation (CFR) 1910.120 and 1926.59 as administered by the Federal Occupational Health and Safety <br /> Administration (OSHA). The HASP is included in Appendix C. <br /> The PHSO will ensure that field activities are performed in accordance with the HASP, and in such a way as <br /> to avoid risk or bodily harm to persons or damage to property. Partner personnel working at the Site will <br /> have received OSHA 40-hour health and safety training in accordance with the requirements of the United <br /> States Environmental Protection Agency (USEPA) and State of California Occupational Safety and Health <br /> Administration (OSHA) Requirements for Hazardous Waste Operations and Emergency Response <br /> Quality Assurance/Quality Control Plan <br /> Tracy Corners Shopping Center <br /> 3225 North Tracy Boulevard <br /> Tracy,California 95376 <br /> Partner Project Number SM14-129814 <br /> Docket Number HAS-VCA 14/15-108 <br /> August 15,2016 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.