My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 1 . Introduction <br /> This written Health and Safety Plan(HASP) is designed to identify, evaluate, and control safety and health hazards, and to <br /> outline emergency response actions for AECOM-managed activities.This HASP must be kept on site during work activities and <br /> made available to all workers including subcontractors and other site occupants for informational purposes.AECOM <br /> subcontractors are expected to independently characterize, assess, and control site hazards created by their specific scope of <br /> work. <br /> This section of the HASP summarizes important AECOM Safety, Health and Environment(SH&E)Procedures that apply to all <br /> DCS Americas jobs. See Attachment C for the project Task Hazard Assessment(THA)forms and Attachment D for a list of <br /> applicable field SH&E Procedures. These field SH&E procedures must be readily available to the field employees(i.e. PDF, <br /> electronically, etc.). <br /> 1 .1 Applicable References <br /> This HASP conforms to the regulatory requirements and guidelines established in the following documents: <br /> ■ Federal Occupational Safety and Health Administration (OSHA)Code of Federal Regulation Title 29, Part 1910 <br /> (29 CFR Part 1910), Safety and Health Regulations for General Industry and 29 CFR 1926, Safety and Health <br /> Regulations for Construction. <br /> ■ Title 8 of the California Code of Regulations(8 CCR),with special attention to Section 5192 Hazardous Waste <br /> Operations and Emergency Response, and Section 3202, Injury Illness Prevention Program and to Sub Chapter 4, <br /> Sections 1500- 1938 Construction Safety Orders. <br /> ■ National Institute for Occupational Safety and Health/Occupational Safety and Hazards Administration/U.S. Coast <br /> Guard/U.S. Environmental Protection Agency,Occupational Safety and Health Guidance Manual for Hazardous <br /> Waste Site Activities, Publication No. 85-115, 1985. <br /> ■ The requirements in this HASP also conform to AECOM's Safety for Life Program requirements as specified in the <br /> AECOM SH&E Manual. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 1 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.