My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_DTSC LETTER
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
CORRESPONDENCE_DTSC LETTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:27:08 PM
Creation date
3/2/2026 11:16:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
CORRESPONDENCE
FileName_PostFix
DTSC LETTER
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No additional details or requirements. Contractor will follow procedures in <br /> the QAPP and Contract. This is contingent upon retrieval of access <br /> agreements and DTSC Contract PM authorization through an email. <br /> • Task 7: Laboratory Analysis <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Contract. <br /> • Task 8: Investigation Report <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Contract. <br /> • Task 9: Resample Soil Gas and Sub Slab and Memo <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Work Plan. This is contingent upon DTSC Contract PM authorization <br /> through an email. <br /> • Task 10: Soil Gas Probes Decommissioned and Memorandum <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Work Plan. This is contingent upon DTSC Contract PM authorization <br /> through an email. <br /> II. DELIVERABLES AND IMPLEMENTATION SCHEDULE <br /> Contractor shall start work in accordance with the Work Order issued by DTSC and shall <br /> follow the schedule in this Work Order. All deliverables identified below must be <br /> acceptable to DTSC before they are deemed complete and must be submitted within <br /> calendar days specified. Tasks 1 — 3 have already been started and are discussed within <br /> the Contract. If the Contractor needs additional time to complete the deliverables <br /> discussed below, the Contractor will send an email to the DTSC PM with a description of <br /> the deliverable, proposed date and explanation. Requesting a new date will be considered <br /> as a Field Order. <br /> The dates below are in business days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.