No additional details or requirements. Contractor will follow procedures in <br /> the QAPP and Contract. This is contingent upon retrieval of access <br /> agreements and DTSC Contract PM authorization through an email. <br /> • Task 7: Laboratory Analysis <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Contract. <br /> • Task 8: Investigation Report <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Contract. <br /> • Task 9: Resample Soil Gas and Sub Slab and Memo <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Work Plan. This is contingent upon DTSC Contract PM authorization <br /> through an email. <br /> • Task 10: Soil Gas Probes Decommissioned and Memorandum <br /> No additional details or requirements. Contractor will follow procedures in the <br /> QAPP and Work Plan. This is contingent upon DTSC Contract PM authorization <br /> through an email. <br /> II. DELIVERABLES AND IMPLEMENTATION SCHEDULE <br /> Contractor shall start work in accordance with the Work Order issued by DTSC and shall <br /> follow the schedule in this Work Order. All deliverables identified below must be <br /> acceptable to DTSC before they are deemed complete and must be submitted within <br /> calendar days specified. Tasks 1 — 3 have already been started and are discussed within <br /> the Contract. If the Contractor needs additional time to complete the deliverables <br /> discussed below, the Contractor will send an email to the DTSC PM with a description of <br /> the deliverable, proposed date and explanation. Requesting a new date will be considered <br /> as a Field Order. <br /> The dates below are in business days. <br />