My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_DTSC LETTER
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
CORRESPONDENCE_DTSC LETTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:27:08 PM
Creation date
3/2/2026 11:16:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
CORRESPONDENCE
FileName_PostFix
DTSC LETTER
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task / <br /> Subtask I Description/Deliverables Schedule <br /> 4 Within 10 days from the approval of <br /> Mailing List / Access Agreements this Work Order <br /> Within 20 days from the approval of <br /> 5 Work Plan this Work Order <br /> Within 20 days from receiving <br /> 6 approval of final Work Plans. All <br /> Field Work fieldwork for Tasks A - C should be <br /> -Implement Work Plan completed within 5 — 7 days. <br /> Laboratory Analysis Within 1 day of collecting the sample. <br /> 7 Contractor submits sample to <br /> laboratory. within 3 days of the lab analyzing the <br /> Contractor received lab analysis sample <br /> 8 Within 20 days after receiving <br /> Investigation Report analytical results. <br /> Resample Soil Gas Probes and <br /> 9 Memorandum 15 days after receipts receiving an <br /> - Resample Soil Gas Probes email. Submit Memorandum 20 days <br /> - Memorandum after receiving analytical results. <br /> Soil Vapor Wells and Sub Slab <br /> Probes Decommissioned and <br /> Memorandum <br /> 10 - Soil Vapor Wells and Sub- 15 days after receiving an email. <br /> Slab Probes Submit Memorandum 20 days after <br /> Decommissioned wells and probes are <br /> - Memorandum decommissioned. <br /> IV. CONDITIONS OF PAYMENT <br /> The Contractor will be paid upon satisfactory completion of work and receipt of a proper <br /> and complete invoice as discussed in the Contract, Exhibit B. <br /> The Pricing Schedule, which is attached hereto as Attachment B, includes the cost <br /> breakdown for Task 4 through 10. Contractor will be paid according to the payment terms <br /> in the Contract and will be paid the other direct charges (ODC) in the Attachment B for <br /> completing the work. For example, Contractor will only be reimbursed for the laboratory <br /> analytical cost if the laboratory analyzes a sample. The contingency funds can only be <br /> accessed with written approval by DTSC through either a Work Order Approval Form or <br /> a Field Work Order. <br /> Tasks 4 through 8 shall be executed subsequentially. Task 5 will only be completed upon <br /> the completion of Task 4; Task 6a will only be executed upon the approval of the Work <br /> Plan, tasks 6b and 6c shall be commenced upon receipt of DTSC authorization via email <br /> indicating which sites will be qualified for sub-slab vapor and indoor/outdoor air sampling. <br /> Task 7 shall be completed upon the commencement of Task 6 concurrently; and Task 8 <br />