Laserfiche WebLink
WORK PLAN FOR ADDITIONAL SITE INVESTIGATION Irerracon <br /> Vacant Property Tracy, California <br /> April 16, 2021 Terracon Project No. NA197074B <br /> Additional soil samples may be selected for delivery to the analytical laboratory. However, these <br /> soil samples will be placed on hold for potential contingent analyses, if recommended based on <br /> review of the initial soil sample analytical results. <br /> The soil samples will be collected into laboratory-prepared containers. The containers will be <br /> labeled and placed on ice in a cooler. The soil samples and completed chain-of-custody forms will <br /> be transported to a State of California-certified laboratory for analysis. <br /> Groundwater Sampling <br /> Following drilling and sampling to depths where soil impacts from the release are no longer evident <br /> in the soil boring for SB18, the boring will be extended to approximately 60 using the hollow-stem <br /> auger capability, if required, to complete this boring as a temporary sampling well (TSW) for the <br /> collection of a groundwater sample. The TSW will be constructed by installing 5 feet of 1-inch <br /> diameter, 0.010-inch machine slotted PVC well screen with a threaded bottom cap, with 1-inch <br /> diameter, threaded,flush-joint PVC riser pipe to surface.The TSW will be left in-place long enough <br /> to allow time for enough groundwater to accumulate and be sampled. The groundwater sample <br /> from the TSW will be collected using a new disposable polypropylene bailer or low flow sampling <br /> equipment and new disposable tubing. <br /> The groundwater samples will be collected into laboratory-prepared containers. The containers <br /> will be labeled and placed on ice in a cooler. The samples and completed chain-of-custody forms <br /> will be transported to a State of California-certified laboratory for analysis. <br /> 2.2.4 Boring Abandonment <br /> Terracon will schedule the backfilling inspection with the SJCEHD no later than 48 hours prior to <br /> planned field work activities to ensure the availability of an SJCEHD representative. Additionally, <br /> Terracon will confirm the field work date and inspection time with the inspector 24 hours prior to <br /> field work. <br /> At the completion of sampling activities and in the presence of an SJCEHD representative,the soil <br /> borings will be backfilled using neat cement. A tremie pipe will be lowered to within three feet of <br /> the bottom of the boring and the cement slurry will be deposited into the borings via the tremie <br /> pipe. <br /> The proposed sampling locations may be modified in the field to account for access limitations <br /> and/or site conditions. The client will be notified of any significant modifications to the sampling <br /> locations. The sampling and analytical program are summarized in Table 1 below. Details on <br /> sample collection and handling procedures are provided below. <br /> Responsive■ Resourceful ■ Reliable 6 <br />