My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North County Recycling Center and Sanitary Landfill <br />Storm Water Pollution Prevention Plan <br /> <br /> <br /> <br />Page 42 <br />Row <br />No. Minimum Permit Requirement Facility-Specific Implementation <br />5. <br />Maintain documentation of all completed <br />training classes and the personnel that received <br />training in the SWPPP. <br />San Joaquin County has all personnel sign a training <br />roster for each training session, and the roster is kept <br />in the Landfill Operations Manager’s office. <br /> <br />8.1.7 Quality Assurance and Record Keeping <br />In order to assure that the SWPPP is effective, and to assure its implementation, San Joaquin <br />County uses the following Quality Assurance / Quality Control BMPs: <br />Table 8.1.7 – QA and Record Keeping Measures <br />Row <br />No. Minimum Permit Requirements Facility-Specific Implementation <br />1 <br />Develop and implement management <br />procedures to ensure that appropriate staff <br />implements all elements of the SWPPP, <br />including the MIP; <br />San Joaquin County management implements this <br />requirement by doing the following activities: <br />1. San Joaquin County management facilitates an <br />annual training meeting covering all areas of this <br />SWPPP and makes sure that appropriate facility <br />personnel attend these training meetings. <br />2. Trained personnel perform a monthly site <br />inspection using Form 2, and files each month’s <br />completed form in the storm water files in the <br />administration office. <br />2. <br />Develop a method of tracking and recording <br />the implementation of BMPs identified in <br />the SWPPP <br />The Landfill Operations Manager: <br />1. Reviews monthly Form 2 inspections <br />2. Follows-up with action items <br />3. Documents follow-up actions on Form 2 <br />3. <br />Maintain the BMP implementation records, <br />training records, and records related to any <br />spills and clean-up related response activities <br />for a minimum of five (5) years (Section <br />XXI.J.4). <br />San Joaquin County maintains documentation of <br />monthly observations, storm water sampling and <br />observations, annual evaluations, analytical testing, <br />training, spill response, reporting or any storm water <br />related issues in the storm water files in the <br />administration office. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.