My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0544282
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 11:06:17 AM
Creation date
6/23/2026 9:01:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544282
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. INVESTIGATION DERIVED WASTE MANAGEMENT <br /> 5.1 Overview <br /> The following SOP outlines procedures for handling investigation-derived waste (IDW) <br /> generated during the investigation. IDW is anticipated to include, but may not be limited <br /> to, soil, groundwater, decontamination water, disposable sampling implements, personal <br /> protective equipment (e.g., disposable gloves), plastic bags, and miscellaneous <br /> paper/plastic trash. Soil cuttings, well purge groundwater, and decontamination liquids <br /> generated during Site investigation activities will be contained in sealed, leak-proof <br /> containers. Solid (non-soil) IDW will be put into a plastic garbage bag and placed in a <br /> municipal refuse dumpster. <br /> 5.2 Equipment <br /> • PPE and air monitoring equipment as required by HASP; <br /> • DOT-approved drums (provided by subcontractor); <br /> • Non-hazardous drum labels; <br /> • Hand auger, shovel,trowel, or other similar soil sampling implement; <br /> • Disposable bailers and nylon string; <br /> • Soil sampling containers; <br /> • Water sampling containers; and <br /> • Cooler with ice. <br /> 5.3 Documentation <br /> • DFRs; <br /> • Laboratory chain of custody forms; and <br /> • IDW management form. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.