My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
After installation, all equipment shall be protected from damage from, including but not limited <br /> to, dust, abrasive particles, debris and dirt generated by the placement, chipping, sandblasting, _ <br /> cutting, finishing and grinding of new or existing concrete, terrazzo and metal; and from the <br /> fumes, particulate matter, and splatter from welding, brazing and painting of new or existing <br /> piping and equipment. <br /> G. Street Cleanup During Construction <br /> Thoroughly clean all spilled dirt, gravel, or other foreign material caused by the construction — <br /> operations from all streets and roads at the conclusion of each day's operation. <br /> H. Office Trailer — <br /> During the performance of the contract, the Contractor shall maintain a suitable office at the site <br /> of the work which shall be the headquarters of the Contractor's representative. _ <br /> The office trailer shall remain on site and operational until Notice of Completion, or until receipt <br /> of notice from the Engineer, at which time the Contractor shall promptly remove these facilities <br /> from the site. The trailer site shall be restored to a condition equal to that which existed prior to _ <br /> trailer installation. <br /> I. Parking and Staging Facilities — <br /> Adequate parking spaces and staging areas shall be provided by Contractor for Contractor's <br /> employees and equipment parking and staging areas shall be gravel, suitable for use under all <br /> weather conditions and prevent dust and mud from being tracked on to paved roads. <br /> J. Sanitary Facilities <br /> Contractor shall make arrangements for the maintenance of adequate sanitary toilet facilities at <br /> or near the work site and shall pay the costs thereof. <br /> K. Electricity <br /> The Contractor shall provide and make arrangements for temporary electric service for power <br /> and lighting as required for the construction work of the Contract and for temporary offices, and <br /> shall maintain such service until the completion of the Contract. Comply with Federal, State and <br /> local codes and regulations and with utility company requirements. Pay all costs of installation, <br /> maintenance fees, disposing charges and removal of temporary services and facilities used. <br /> L. Pre and Post-Construction Video Recordings and Photographs <br /> Contractor shall provide pre and post-construction video recordings of all water and sewer <br /> alignments in both directions of travel, the MacArthur Wastewater Pump Station and all storage, <br /> staging and parking sites. The Contractor shall also provide video recordings at locations <br /> required by Engineer. Video recordings for pre and post-construction inspection shall be <br /> performed as specified in Section 1380. <br /> Division III-17 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468,7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.